August 15th.
With the last floating bridge being towed from a shipyard in the Zhoushan Islands, the Haitan Island-Baisha Jia Cross-Sea Bridge project has entered its final stage.
This 130-kilometer-long cross-sea bridge took only eleven months from project approval to near completion, with a construction period of only nine months.
This type of large floating island bridge requires a floating island platform to be set up every five kilometers. The Haitan Island-Baisha Jia Cross-Sea Bridge has a total of 26 floating island platforms.
The floating platform in front of us is the Hai Bai No. 13 floating platform, which is also located in the middle of the strait.
Many of the construction company's management personnel were on the floating island platforms that had already been installed on both sides. They watched as the floating island platforms were gradually pushed by the barges, their faces showing both joy and tension.
Project supervisor Jiang WeiGuo shouted into a high-powered walkie-talkie, "Old Huang, tell the barge to slow down. This is the final moment, don't let anything go wrong."
"Okay." A hoarse, middle-aged male voice came through the walkie-talkie.
Project manager Ai Zhefu put down his binoculars. "Supervisor Jiang, don't be too nervous. This project is the easiest one I've ever done since I started working in the large-scale engineering industry."
How could it not be easy? Jiang WeiGuo silently complained to himself.
The only place where this new type of floating bridge requires on-site construction is where the connecting bridges and service areas are built on both sides of the main bridge.
Even the installation of anchorages for securing cables on the seabed is done without the need for a construction company. A specially made cement ship is used, and then a large amount of special cement, sand, and stones are placed on the ship.
Once at the designated location, the sea valve is opened, allowing the cement ship to sink to the seabed. The special cement inside the cement ship will quickly solidify and become heavier after being submerged in seawater.
Each floating island platform typically requires four cement shipwrecks as anchor points. Each cement shipwreck, once sunk to the seabed, can weigh up to 300,000 tons.
The floating platform, along with the 5-kilometer-long railway and highway bridges, weighs approximately 600,000 tons.
The anchor points of cement-wrecked ships come with special cables. All that's needed is an engineering support vessel to use a robotic arm to retrieve the cables from the seabed and then connect them to the floating island.
The reason for not using the floating island's own cables and anchors is to take into account the need for quick release of the cables.
In the event of an emergency requiring the anchoring cable to be disconnected, the staff will not be able to go down to the seabed to work and will have to operate from the floating island. This requires that the anchoring cable can be released from the floating island.
Of course, the floating island is equipped with four emergency anchoring lines, which is similar to the anchor system of a large oil tanker, and can be used for temporary mooring in other sea areas.
Ai Zhefu turned to look at Xia Yanxin, the deputy project manager who had just finished a phone call, "Yanxin, what did headquarters say?"
"Headquarters has asked us to complete this project as soon as possible. The Ryukyu Islands Cross-Sea Bridge project will begin in three months."
Ai Zhefu took a sip of mineral water. "The company won the Ryukyu Islands Cross-Sea Bridge project?"
"Yes, but this project is quite difficult, and it will probably take about four years." Xia Yanxin picked up the chilled watermelon next to him and took a few bites, quenching his thirst after talking on the phone for half an hour.
"That goes without saying." Ai Zhefu knew the length of the Ryukyu Islands Cross-Sea Bridge.
The Ryukyu Islands Cross-Sea Bridge starts from the south side of Kyushu Island in Japan, passes through the Ryukyu Islands, and ends near Keelung Port on Dayuan Island. It is 1,176 kilometers long and includes some deep waters along the way.
After swallowing a mouthful of cool watermelon flesh, Xia Yanxin asked with some confusion, "I thought we would win the Penghu Islands Cross-Sea Bridge project in the south, but I didn't expect that the Kaohsiung Engineering Group won it."
"Hehe, you think we've gotten all the benefits?" Ai Zhefu shook his head with a smile.
"That's true." Xia Yanxin also realized this, but then he smiled strangely. "It's no use for them to win this project. After all, the bulk of these cross-sea bridges isn't something that engineering companies like us can get."
Ai Zhefu naturally understood Xia Yanxin's unspoken meaning.
These engineering companies that contract for cross-sea bridge projects now make money from the construction of supporting facilities on both sides of the bridge. The profit margin for the main body of the bridge is very low because the main body of the bridge is purchased from four major specialized construction groups.
Currently, within the Asian Union, there are only four companies involved in the construction of floating bridge platforms: TieJian Haiqiao Group, Minqin Marine Engineering Company, Asian Road and Bridge Engineering Group, and China Construction Marine Engineering Group.
For example, the Haitan Island-Baisha Jia Cross-Sea Bridge was built using floating island platforms supplied by TieJian Haiqiao Group. Each floating island platform, including the railway, electrification equipment, and cement anchor vessels, was quoted by TieJian Haiqiao Group for 1.5 billion yuan, averaging about 300 million yuan per kilometer.
In other words, the 130-kilometer main structure of the Haitan Island-Baisha Jia Cross-Sea Bridge will cost a total of 39 billion yuan.
The company that contracted the project quoted 45 billion yuan for the entire project, with a gross profit of approximately 1 billion yuan.
This is the awful thing about civil engineering.
It's worth noting that the gross profit margin for each of the floating island platforms built by TieJian Haiqiao Group is only around 5%.
The real winners are Minqin Group and Hai Lu Feng Group, which are the sources of the technology. For each floating island platform produced, the company has to pay about 27 million yuan in related patent fees to the two companies.
Therefore, neither Hai Lu Feng Group nor Minqin Group contracted for the cross-sea bridge construction project, but instead acted as suppliers.
In fact, the engineering company that contracted the Ryukyu Islands Cross-Sea Bridge project is much more cunning than other companies.
The reason is very simple.
Projects like the Haitan Island-Baisha Jia Cross-Sea Bridge actually see the profits eaten up by the floating island suppliers and the technology R&D companies at the source, leaving the engineering companies barely scraping by.
However, the Ryukyu Islands Cross-Sea Bridge is different because it passes through many islands along the way. Therefore, it is necessary to build supporting projects on these islands. This means that there are more projects that need to be built locally, which can increase their profit margin.
Of course, since this project is being built in the waters of the Ryukyu Islands, it will definitely need to cooperate with Japan companies. For example, some parts and materials, as well as railway equipment and trains, will be handed over to Japan companies for production.
This is also an inevitable choice for win-win cooperation.
As Ai Zhefu said, the benefits certainly cannot be taken by one family.
As a community of shared interests, the Asian Union, even if Seres holds a dominant position, must still respect the interests of other members within it. Only in this way can the internal structure be more stable.
"Hiccup..." Xia Yanxin hiccuped, picked up a tissue to wipe his mouth, which was covered in watermelon juice, and suddenly remembered something:
"Mr. Ai, I heard that the railway section of the Ryukyu Islands Cross-Sea Bridge will use Vacuum Tube Maglev Railway. Why doesn't this bridge use one?"
"You're overthinking it. This bridge is only a little over 130 kilometers long. Why would you build Vacuum Tube Maglev Railway? Do you have that much money to spend?"
"But I heard that this kind of railway is very fast, reaching a speed of one thousand kilometers per hour."
"Hehe, it's true that it's a thousand kilometers per hour, but you have to consider the distance between the two stations."
"Station distance?" Xia Yanxin frowned, then looked puzzled. "That's not right! If we're considering station distance, then the Ryukyu Islands Cross-Sea Bridge project has a lot of stations."
Ai Zhefu picked up his binoculars and looked at the slowly moving floating island, then asked confidently, "Do you believe that the railway part of this project only has two stations?"
"What? Two stations? This..."
"The vacuum tube maglev train must take into account passenger flow and economic benefits. Kaohsiung and Kagoshima Prefecture on both sides have huge populations, but how many people are in the Ryukyu Islands in the middle?"
Xia Yanxin picked up his phone and searched for information.
Just as Ai Zhefu had predicted.
The Ryukyu Islands have a total population of only about 1.45 million, and as an archipelago, the population is very scattered, making it not worthwhile to build a train station in the middle.
Conversely, Dayuan Island has a population of 23 million, while Kyushu Island has a population of 12 million. Meanwhile, with the successive completion of cross-sea bridges between the Japan islands, including the Tsushima Strait Bridge.
The entire Northeast Asia region has a population of approximately 180 million, and the Dayuan Island, connected to the East Asia mainland via a cross-sea bridge or to the Luzon Islands to the south, also has a large population.
There must be a population for there to be a flow of customers.
That's why Ai Zhefu was so certain that the railway section of the Ryukyu Islands Cross-Sea Bridge project would only have two stations.
This is also the unfortunate situation of Vacuum Tube Maglev Railway.
Without a sufficiently long operating distance, this type of railway does not have a speed advantage.
For example, if this cross-sea bridge, which is more than 130 kilometers long, were built into Vacuum Tube Maglev Railway, even with only two stations, the train speed would be very difficult to exceed 600 kilometers per hour.
This isn't a problem with the equipment; it's just that the distance doesn't allow it.
Trains need acceleration and braking distances, but in a vacuum tube, without air resistance and track friction, the train must brake a very long distance in advance to ensure a safe stop at the station.
The distance is over 130 kilometers. If you travel at a speed of 600 kilometers per hour, the whole journey will probably take about half an hour.
Even at a speed of 1,000 kilometers per hour, including acceleration and braking, it would take more than 20 minutes.
Therefore, this speed of 1,000 kilometers per hour does not seem to be cost-effective.
The train speed only becomes more valuable the longer the distance between the stations on both sides of the vacuum tube.
Taking the railway distance of the Ryukyu Islands Cross-Sea Bridge project as an example, the entire journey would only take about 1 hour and 20 minutes.
This is nearly nine times the distance of the Haitan Island-Baisha Jia Cross-Sea Bridge, but the one-way travel time is only three to four times different.
The longer the distance between stations, the more cost-effective the Vacuum Tube Maglev Railway becomes.
In fact, the most suitable regions for applying Vacuum Tube Maglev Railway are projects similar to the East Asia -North America Pacific Ocean Trans-Sea Railway, the Australia-South America Pacific Ocean Trans-Sea Railway, and the North America-Europe Atlantic Ocean Trans-Sea Railway.
These projects often involve railway lines that are thousands of kilometers long. For example, the straight-line distance between Shanghai and San Francisco is approximately 9,900 kilometers.
At this distance, Vacuum Tube Maglev Railway can even increase the train speed to 2,000 kilometers per hour, and it can cross the east and west coasts of the Pacific Ocean in just about five hours.
For short-distance railways, there is no need to use Vacuum Tube Maglev Railway, especially for densely populated areas like Seres and Japan with numerous stations along the way. If Vacuum Tube Maglev Railway were built, the train speed would simply not be able to be increased.
Before we knew it, the western sea was shimmering with the afterglow of the setting sun.
With the help of the barges pushing and pulling, the last floating platform finally came to a stable stop in the designated position, and then the floating platform unfolded into cable-stayed bridges on both sides.
The moment the two sides of the bridge precisely came together.
Slap slap slap...
Everyone present spontaneously applauded.
The TV crew, who had been waiting for a long time, did not miss the scene. Several cameras and aerial drones captured the key moments of the entire process, and then they began to edit the footage intensively at their temporary camp on the adjacent floating island.
As for the interviews, they were actually completed by noon today; we're just waiting for the final footage.
On the floating island platform No. 12 next door.
Ai Zhefu and others also held a celebration banquet for their employees.
There is a lot of space in the middle of each floating island platform. After all, if you look at it from another perspective, this kind of floating island platform is a giant ship. Since there is no cargo being transported on it, the space is naturally very large.
In fact, once this cross-sea bridge is put into use, professional personnel will need to be stationed on these floating island platforms. In particular, the dozen or so floating islands in the middle of the bridge will not only need to be stationed, but also require the construction of dedicated service stations and maintenance stations.
Haibai No. 12 is the location of one of the service stations and repair stations.
Although it is not yet in use, some infrastructure has been installed, including water, electricity and internet services, as well as toilets, bathrooms, staff dormitories, and a canteen.
The construction site cook brought out plate after plate of dishes.
The menu includes Sichuan-style chicken, braised goose, roasted lamb chops, garlic scallops, garlic stir-fried dried shrimp, steamed pork ribs with Kung Pao Chicken, Kung Pao chicken, eggplant with garlic sauce, chicken and pork rib corn soup, lobster balls, Blanched Choy Sum, Hand-Shredded Cabbage, and candied sweet potatoes.
Looking at the abundant food on the table, Ai Zhefu picked up a bottle of iced tea. "Although the project is almost finished, it's still under construction, so I'll drink tea instead of alcohol. Cheers!"
"Cheers!"
The others also took a sip of their favorite drinks.
"Come on, don't be shy."
"Mr. Ai, you're too kind. We won't stand on ceremony."
"This lobster ball is good."
"Of course, this is made from real lobster, not starch balls."
After a while.
The interview team also came over for lunch.
They didn't find the construction company's meals to be extravagant. Nowadays, chicken, duck, goose, lamb chops, and seafood are all very cheap in China, and ordinary families can buy them easily.
Bububu...
A melodious ship horn sounded from the sea not far away.
The lighthouse on the floating island has already turned on its guiding light and is communicating with passing ships through the maritime department's system.
Although the distance between the floating islands is more than four kilometers, and the bottom of the bridge deck is 100 meters above the sea, even super-large transport ships can safely pass through the bridge arches.
But this is no reason to be complacent.
In the event of encountering a erratic or erratic ship operator who does not follow the rules, it is essential to promptly identify and notify the operator so that they can give way.