Following Li Ye's instructions, Engineer began searching southeast of the Mountainous Region.
As usual, it dispatched Level 2 Goblin Petroleum Survey Vehicles.
Because the Mountainous Region's terrain was rugged and extremely difficult to traverse, the petroleum survey vehicles were jointly suspended by two Black Hawk Helicopters as they conducted patrols and surveys.
Amid the vast mountain ranges, Engineer slowly moved forward.
The Omni-Directional Track Cluster and Rock Bolt Anchors worked together to firmly secure the Mobile City to the mountainside.
After confirming the oil field's location, Engineer began excavation.
The Mechanical Arms fitted with drill bits began operating, gnawing into the earth's crust at thousands of revolutions per minute.
With a thunderous rumble like the earth roaring, dark green crude oil suddenly gushed from the borehole, forming an oil column dozens of meters high under the pressure.
Engineer was not the only Mobile City in the Mountainous Region.
However, unlike the former, the others were not drilling for oil but carrying out engineering projects.
The western Wasteland Zone bordered the Basin Area, and Humanity's Three Major Organizations had decided to open a transport corridor between the two regions.
The greatest difficulty in building a transport corridor through the mountains was naturally digging tunnels through the mountain itself.
For Mobile Cities, however, this was not a problem.
For this purpose, Humanity's Three Major Organizations had brought in twelve Excavation Cities to serve as tunnel-boring machines.
After completing their modifications, the Excavation Cities began working.
Following the designated routes, they started digging.
The thirty-meter-diameter circular cutterheads spun out dizzying afterimages, while 132 alloy roller cutters gnawed at ancient granite under the hydraulic systems' immense pushing force of tens of thousands of tons. Fractured stones burst between the cutter teeth, throwing off dazzling sparks.
The tunnels were filled