This wasn't the first time the Han Tribe had dug a river to fire bricks; they already had a group of skilled people. With these elders mentoring the newcomers, their proficiency would improve quickly. The only challenge was that there were quite a few different types of brick blanks this time.
Luo Chong personally designed new wooden brick molds and had the Carpentry Group mass-produce them, leaving the rest to his own devices.
Previously, the Carpentry Group leader and the Metallurgy Group leader had been appointed. This time, Luo Chong appointed the Lame as the leader of the Kiln Worker Group, which is currently the largest group in terms of the number of people. The workload is also very large. Not only do they have to fire bricks, but they also have to Pottery Making. In the future, they will fire many other things. Now, all of these have been handed over to the Lame, an elder of the Han Tribe, to manage.
With the river dredging and brick-making project on track, Luo Chong began researching something new: a tool specifically designed for road compaction and land leveling.
What is used for road rolling? In his previous life, Luo Chong had seen Road Roller with two large rollers in the front and back, which people could sit on and drive. They were very efficient and convenient, so he now wanted to make a kind of roller.
The most common material for making millstones is Stone, but the Han Tribe do not have iron and steel now, so it is not practical to use bronze to carve Stone. If the bronze has too little tin content, it will be too soft and bend when hit. If the content is too high, it will be too brittle and break easily. Therefore, Luo Chong abandoned the plan to grind Stone Roller.
Later, Luo Chong recalled the method used by the Egyptians to build the pyramids with granite. They sawed giant granite blocks into bricks to build the pyramids. The method they used was to sprinkle a layer of quartz sand on the granite and then use a flat copper strip as a saw to rub it on.
The principle behind this method is that sand is harder than granite. People pull copper strips back and forth, causing the sand and granite to rub against each other. This method is used to saw through hard granite. However, it's not feasible to use this method to make Stone Roller. The second method was rejected by Luo Chong.
An easier way is to simply saw off a section of log to use as a millstone, but wood is too light to be suitable for making a millstone.
After racking his brains for a long time, Luo Chong finally came up with a millstone that was unprecedented and would never be repeated. He made a ceramic Pottery Roller by firing clay. He came up with this idea after seeing Water Jar. He figured that if you lay the Water Jar down, you could make a millstone.
The Pottery Roller could not possibly be solid, because it would not be able to be fired thoroughly. The Pottery Roller designed by Luo Chong was a coaxial roller.
The outside is a ceramic tube with a diameter of one meter, a length of one meter two inches, and a thickness of six centimeters, which is open at both ends. Inside is a thin ceramic tube with an inner diameter of 10 centimeters and a thickness of 5 centimeters.
Then, have the Carpentry Group make two round wooden boards with holes in the middle, which can connect the two ceramic pipes of different sizes. After that, fill the gap between the two ceramic pipes with soil and tamp it down to increase their weight. Then, use round wooden boards to secure the ends.
Such a Pottery Roller, with a diameter of one meter, weighs over a thousand kilograms. It is certainly capable of rolling roads. When in use, a sturdy wooden stick is inserted into the thin clay tube in the middle, and it can be pulled by an ox.
When not in use, or when the Pottery Roller needs to be transported to another place for road construction, the two round wooden planks on the side of the Pottery Roller can be removed, and the soil inside can be poured out to reduce the weight. In this way, two people can carry the Pottery Roller away, or one person can push it.
The soil inside acts as a counterweight, and the amount of weight can be freely adjusted. It's practically a primitive infrastructure tool!
The first Pottery Roller prototype was a success. Luo Chong waved his hand and ordered the Lame to make 20 more. Such a practical and powerful millstone could be made in just one day. Wouldn't that completely outclass those Stone Roller makers?
While the Lame was firing the Pottery Roller, Luo Chong began to design and plan the drainage system, or sewers, for the entire city.
A sewer system is essential; otherwise, once the city walls are built, a heavy rainstorm could flood the entire city.
This drainage system is only used to drain rainwater. The toilets of each household are cleaned regularly, and the excrement can be taken outside the city and collected in a special Compost Pit. It is then decomposed into organic fertilizer and returned to the fields.
This serves two purposes: firstly, it maintains the cleanliness of the city, and secondly, it allows for the reuse of waste, since manure is a usable resource for an agricultural tribe.
The drainage system of the entire city is very simple, with only two levels. The first level is to dig a ditch half a meter wide and half a meter deep in the middle of each alley, flatten the bottom and pave it with bricks, surround it with paving bricks on both sides, and then cover it with a 60-centimeter paving brick horizontally. A perforated Blue Brick is left at the door of each house as a cover.
The second-level sewer system involved digging a ditch half a meter wide and one meter deep between the four main roads forming a grid pattern and the ring road. The ditch was then leveled, lined with bricks, and covered. Eight outlets were dug from the main sewer system along the ring road, leading to the moat, with two outlets under each side of the city wall, thus achieving the purpose of draining the urban area.
During heavy rain, because the secondary sewer is half a meter lower than the primary sewer, rainwater from the Residential Area will flow along the primary sewer to the secondary sewer on the main road, and finally into the moat.
This approach is simple to implement, as it doesn't require drilling underground; it can be completed directly on the ground. Furthermore, if the sewer becomes clogged due to prolonged use, the sludge can be cleared simply by lifting the cover. Post-construction maintenance is also very convenient.
With all the important details planned, construction began. Luo Chong hadn't formally studied architecture or building, but he had learned about reverse architecture—demolition and demolition of military targets. He also needed to study structural engineering, though not as professionally as someone with formal architectural training.
The bricks for building the house hadn't been fired yet, but that didn't stop Luo Chong from leading his men to lay the foundation. He summoned 20 boys and girls from the Cave Tribe, intending to train these children who loved digging into a professional civil engineering construction team.
First, guide them to build First Institute house so they can learn the whole process.
First, we need to tell them common sense: houses for people to live in should face south to block the north wind in winter, and windows should open to the south to ensure plenty of sunlight throughout the year.
Then we started laying out the lines, finding the specific construction site, and then began digging the foundation trench for the wall. The trench was about 80 centimeters deep. After digging, we started compacting the foundation.
The tool for tamping the foundation is a section of sawn-off log with two handles attached to one end. The log is not very thick, only about 30 centimeters. One person can operate such a tamping hammer by lifting it up and slamming it down repeatedly until it can no longer be tamped down.
The excavated soil will be piled up inside the house to raise the floor. The indoor floor must be higher than the yard floor, otherwise rainwater will flow into the house when it rains. This is common sense.
Therefore, the house of a single-story house is usually at least one step higher than the yard, and it is rare to find a house where the house and the yard are the same height.
Twenty young men and women worked from sunrise to sunset, and could complete the foundations of two houses a day, which is six houses in total. This was a decent pace. After the foundations were compacted, they could wait for the bricks to be laid to build the walls.