The Zhao Bridge: Over a Thousand Piers Joining More Than Five Hundred Bridges!
While the villagers of Shanghe Village were learning how to grow vegetables from the immigrants, a construction project of unprecedented scale was underway in Dark Bridge Jiahai Commandery, hundreds of kilometers away.
Tens of thousands of people gathered on the coast north of the Dark Bridge. Countless rammed earth houses stretched out in a row, their scale no less than that of a county town of the Han Tribe. On the sea, countless sailboats lined up, obscuring the entire strait between the mainland and Qiongzhou Island on the opposite side.
On this side of the mainland, the mountains along the coast are completely bare, all the trees have been cut down and turned into building materials, as well as the temporary pier on the coast.
With a deafening roar, thousands of pounds of Black Powder blasted rocks and soil across the mountain, sending up a cloud of smoke that blotted out the sky. When the smoke cleared, thousands of prisoners of war, armed with Iron Shovel and pickaxes, were obediently herded up the mountain by soldiers like quails. They were then filled with sand, gravel, and soil, which were then pushed down the mountain in Hemp Sack, one cart at a time, and finally transported to the dock to be loaded onto ships.
Despite their large numbers, despite the pickaxes they carried that could easily shatter armor, and despite the Iron Shovel sharp enough to easily sever heads, not a single prisoner of war dared to resist.
Just kidding. Anyone who witnessed the Han Tribe's magical ability to split mountains and shatter rocks would be unable to muster the will to resist. Didn't you see that the house-sized boulder on the mountain was blown to pieces?
Resist? Take a hard line?
Thousands of prisoners of war, like ants carrying food, filled Hemp Sack the loosened rocks and earth from the gunpowder blasting, and then transported them to ships docked at the pier. These sailboats then carried countless sandbags to the top of the Dark Bridge.
The remaining thousands of slaves either carried sandbags off the ship or piled them up in the sea, preparing to use these countless sandbags to build a gravity dam against the sea.
This was something they wouldn't have dared to even think about before: blasting up the mountains on the shore, filling them into bags, and filling the sea with the waste.
Isn't this just like moving mountains and filling seas?
Is this something a human could do?!
But the Han Tribe who captured them were just that crazy.
However, calling it Sea-Blocking Dam is not quite accurate; it actually looks more like a series of wells inserted into the sea.
The engineering command camp on the shore was almost as large as the government office of a county town in the Han Tribe. After all, it had to manage tens of thousands of people, so the necessary management institutions were indispensable.
Elder of Construction Zhu Ping at the huge Sand Table in front of him with great emotion. Although he was nominally the Prefect of Jiahai Commandery, the Han Tribe did not let him govern personally. Instead, they put him in charge of this Cross-Sea Bridge project.
However, it wasn't until he understood the Han Tribe Chieftain's requirements and ideas, and waited for the Han Tribe's construction experts to create an actual model, that he realized how incredible and massive the project he was involved in truly was.
The Engineering Command Post was filled with many big names in the construction industry. After discussing the Chieftain's requirements and design specifications, and taking into account the local conditions, they jointly came up with a plan, which was then Flying Eagle Message to Luo Chong via eagle to obtain project approval.
Zhu Ping still doesn't have administrative authority in this project, nor is he responsible for the design of the main bridge structure. His main responsibility is to provide local hydrological and geographical information. After all, he was born on Qiongzhou Island and studies architecture, so he can provide a lot of help for the bridge construction project. However, even so, Zhu Ping is still very satisfied. He feels that being able to participate in this project personally, and as long as he can see the bridge completed, it would be worth it even if he died on that day.
In the initial stage of the Cross-Sea Bridge, the local hydrological conditions were first collected to determine the high and low tide levels, as well as the length and width of the bridge and the geological conditions of the underwater Dark Bridge.
Xue Qingyao specially hired one hundred young men from the Yu Clan of Chaoyang Commandery at a high price. Taking advantage of their diving skills, they went deep into the sea to explore the situation. Combined with the information provided by Zhu Ping, they finally determined the environment for the construction of the bridge.
From the grassland mainland, the underwater Dark Bridge to Bamboo Island stretches for more than 23 kilometers. If the bridge connecting the two sides of the land is included, the total Li Chief.
Such a long bridge, and one that can be used for both road and rail, is absolutely unprecedented in the world.
The Cross-Sea Bridge adopts an elevated continuous Arch Bridge structure. According to Luo Chong's suggestion, it should be built according to the structure of the Zhaozhou Bridge. This is a reasonable and durable structure given the current technological and material capabilities of the Han Tribe.
The Dark Bridge beneath the strait's surface is primarily composed of reefs, with the top layer covered by limestone formed from corals and shells. However, this is not important; the Han Tribe used the bottom layer of rock.
The Zhaozhou Bridge is a single-arch Arch Bridge with no piers in the middle and a main span of more than 37 meters. However, this is not enough. Moreover, the Cross-Sea Bridge that the Han Tribe wants to build is more than 20 kilometers long. One arch is definitely not enough. Therefore, Luo Chong's idea is a continuous Arch Bridge.
The specific construction method is to first anchor the bridge piers on the reef of the Dark Bridge, with each span being fifty meters wide. In other words, a bridge pier is set up every fifty meters. Gravity dams are then constructed around the bridge piers using sandbags to keep the seawater outside the sand walls, thus creating a waterless construction space.
Then, vertical holes were drilled into the reef. Since there was no steam drilling equipment available at the time, explosives and manual excavation were used. First, Vertical Shaft were drilled manually, then explosives were loaded and blasted until a vertical shaft was drilled into the reef of the Dark Bridge. Then, precast reinforced concrete pipes that had been made on the shore were inserted into the shafts. Finally, concrete was injected into the pipes. It was like wedging a giant Reinforced Concrete nail into the reef to connect the bridge and the underwater reef into one.
For nails like these, two nails are needed at each rivet point, which is the width of the bridge.
With the same anchor points, spaced 50 meters apart, a total of 460 anchor points are needed. This only considers the underwater route. If we add the bridge piers on the shore, such as the Reinforced Concrete piers that are tens of meters high, the entire bridge would require nearly 500 piers. Then, a large Zhaozhou Bridge would be built on top of every two groups of piers. This is equivalent to connecting 500 Zhaozhou Bridge to form a single bridge.
In the middle section of the entire bridge, there are six extra-long Arch Bridge with spans of 100 meters each, mainly for ships to pass under the bridge. The reef between these bridge piers will be blasted away in the future to allow Three-Masted Sailboat to pass during low water levels, thereby reducing the overall height of the bridge.
Regarding the current progress of the project, the Han Tribe has completed the preliminary Geological Survey/Exploration and the design plan for the bridge. The entire bridge requires nearly a thousand Reinforced Concrete piers, each tens of meters high. The main bridge is 23 kilometers long, equivalent to the length of more than 20 Wuhan Yangtze River Bridge, and 35 meters wide, with a total of six lanes in both directions.
The middle section of the bridge features two broad-gauge Heavy-load Train tracks with a gauge of 1.8 meters. These tracks allow for simultaneous travel in opposite directions, ensuring uninterrupted traffic flow on the bridge. The design speed is 60 kilometers per hour.
On both sides of the railway track are two lanes, each five meters wide, making a total of four lanes, mainly for horse-drawn carriages.
In other words, this road-rail bridge is not designed like the Wuhan Yangtze River Bridge, which has a double-layer design with a railway underneath and a road on top. Instead, all the road surfaces are on the same horizontal line, with trains running in the middle and horse-drawn carriages running on both sides.
This design is the limit that Han Tribe can currently achieve. In fact, according to modern bridge construction technology, most bridges with such long spans would be solved by using a cable-stayed bridge with steel cables. However, Han Tribe cannot currently manufacture qualified alloy steel wires, nor does it have the construction capability to hoist hundreds or thousands of tons of steel cables and bridge decks.
As for using Iron Chain to build a suspension bridge for Heavy-load Train to pass through?
You should just wash up and go to bed early; you can have anything in your dreams.