With a loud crash, the two rails were slammed to the ground, kicking up a cloud of dust. The workers, who had only walked a few hundred meters, collapsed on the ground, panting heavily.
Fortunately, the guards who were following behind quickly came over and instructed the logistics personnel to bring them mung bean soup to replenish their energy.
Then the guard said to them, "If you think it's too heavy, we'll move one rail at a time. But let me tell you first, today only the three villages will be responsible for moving the rails. We need to move a total of two hundred rails. We need to finish before dark. Be prepared. Tomorrow we will start rotating between the villages."
Upon hearing this, everyone breathed a sigh of relief. They had been genuinely worried that having to carry things like this for a whole day would exhaust them.
The work of moving the sleepers was not easy either. Although there were horse-drawn carts to carry them back and forth, the sleepers were still quite heavy. They were solid timbers, each 1.2 meters long, and each one weighed dozens of kilograms. They had to carry them up and down, and at the same time, they were responsible for binding the two ends of the sleepers with wire. Fifty people were responsible for this work, and there were nearly two thousand sleepers per kilometer, which was not easy either.
If picking rails and moving sleepers are considered hard labor, then securing the rails requires both physical strength and technical skill.
The workers from the other two villages, a total of ten squads, each of which selected a Decade Leader and a Squad Leader, a total of twenty people, are learning how to fix the railway from the craftsmen sent by Lin Fei. After these twenty people have learned, they will each lead four people, so that they can learn quickly.
"Look carefully, everyone. This row of black logs on the roadbed is called sleepers. Before you start working, use this long-headed Iron Hammer to measure the distance between the sleepers. If it's not in place, tap Iron Hammer lightly from both sides until the distance is exactly the same as the length of the Iron Hammer head."
"Then take this black Rubber Pad, which is made by mixing and pressing sesame balls, asphalt, and rubber. Place this pad where the sleepers are placed on the rails, and then put this Steel Plate Seat on top of the Rubber Pad to align the two."
The craftsmen responsible for teaching them the techniques placed a one-centimeter-thick forged steel plate on the Rubber Pad. The Rubber Pad mainly served to absorb shock and increase friction, preventing the rails from swaying from side to side on the sleepers.
The forged steel plate rail seat has a slot in the center to hold the bottom of the rail in place and prevent it from wobbling. On the steel plates on both sides of the slot, there are three holes on each side for hammering in Rail Spike.
Several craftsmen first taught them how to position the sleepers, then placed a Rubber Pad and a steel rail seat on them. Next, they directed everyone to work together to lift a rail onto the sleepers before continuing to teach them the next steps.
"Watch carefully, after you've positioned the rail, insert this Rail Spike into the hole in this base, with the head side pressing against the rail base. Then hammer it in, two spikes on each side, to secure the rail from both sides. Then hammer another nail into the hole on the outside of the base to nail this steel plate to the sleeper. Watch me do it once."
As the craftsman spoke, he instructed the workers to widen the circle a bit, step back two steps to give themselves space, check the distance between the sleepers, make minor adjustments, and then place the Rail Spike in the pre-drilled hole in the steel plate. He then swung the sledgehammer a few times and hammered a Rail Spike as thick as a finger into the sleeper.
Rail Spike are usually flat-headed and not sharp, so when they are driven in, they break the wood fibers along with the sleepers, preventing them from cracking. If a pointed nail were used, it would definitely split the sleepers.
The craftsman demonstrated and explained the techniques for hammering nails.
Although Rail Spike are large, they also have nail heads, which are flat objects that protrude from the end of the nail. However, unlike ordinary nails, the head of a rail Rail Spike only protrudes outward on one side, and its purpose is specifically to hold the edge of the rail in place.
To secure the track with these nails, you need to nail them slightly inward and upward so that the nails on both sides can grip the track more tightly. After all twelve Rail Spike on a sleeper are nailed in, the craftsman takes out a few paperclip-shaped curved Spring Clip and then speaks to everyone again.
"Watch closely, everyone. After the Rail Spike are driven in, use this clamp to attach one to each connection between the rail and the sleeper. Hold it at an angle perpendicular to the rail, then hammer it in place. That completes the work on this sleeper."
Each section of rail requires more than 180 sleepers to be nailed in. Now, try it yourself following my instructions. If you have any questions, feel free to ask.
Remember this: you all must learn this skill, because you will be responsible for teaching the same group of people in your unit this technique. If you don't learn it, you should know what will happen to you, right?
After the craftsmen finished instructing the twenty Squad Leader and Decade Leader, they immediately put them to work, in pairs, working from both ends of a sleeper simultaneously. This would make the construction process faster.
They started construction on the section that extended from inside the factory, and at the joint they had just laid.
Twenty men lined up and began to correct the spacing of the sleepers, then they started to drive in the Rail Spike, and finally used Spring Clip to completely lock the track in place.
Several craftsmen stood by and inspected the work. If they found that someone had nailed the rails poorly or in the wrong order, they would personally provide on-site guidance. By the time they had nailed the first 100-meter-long section of rail, the group had also figured out the basic procedures and operating techniques.
Then the Decade Leader and Squad Leader returned to their respective teams and began explaining the installation process, techniques, and precautions to their team members. In this way, the installation teams of a total of one hundred people from the two villages began to slowly install the track.
After everyone had installed 500 meters of rail, the 100 installers had basically figured out the steps, procedures, and precautions. Their speed in installing the rail also increased. As long as the sleepers and rails were in place, the 100 people could install a 100-meter section of rail in about ten minutes.
This continued until the afternoon. The six villages involved in the railway paving had already laid 1.6 kilometers of track from the Locomotive Factory. It was at this point that Lin Fei, who was in charge of the entire project, made the decision to temporarily halt the paving team's work. After receiving reports from several craftsmen, he discussed the matter with the Chieftain and ultimately decided to agree to the craftsmen's suggestion to send out the train now, load up the necessary materials, and continue paving forward.
They've already laid 1.6 kilometers of track. If they still use the old method, with fifty people carrying one track at a time on foot, not to mention how tiring it would be, just walking back and forth would waste a lot of time. The efficiency is just too low.
Luo Chong inquired with Lin Fei about the Endeavor Model vehicle and whether the train carriages could perform this task, and the answer was affirmative.
The prototype of the Endeavor Model was completed a week ago, and even painted in black and red. As for the carriages that carry the rails, there are no ready-made ones.
Assuming the width of the carriage is 2 to 2.5 times the track gauge, the carriages used on this railway with a track gauge of only 75 centimeters would be about 1.5 to 1.8 meters wide. To save costs and improve the stability of the carriages, Luo Chong set the width at 1.6 meters. If used for passenger transport, this width would barely be enough to fit three seats side by side.
Based on the calculation that the length of the carriage is seven to eight times its width, a carriage that is 1.6 meters wide would be between 11.2 meters and 12.8 meters long. Luo Chong simply rounded it up and set the length of the carriage at 12 meters.
Therefore, the passenger and freight cars previously manufactured by the Locomotive Factory were all made according to the standard of being 1.6 meters wide and 12 meters long. However, the cars used for hauling goods had Carriage Wall on all four sides, which limited the length of the load. It was possible to transport those scattered sleepers, but it was obviously impossible to transport 100-meter-long steel rails.
To transport steel rails, at least eight carriages are needed, and they must be Flatbed Cart so that the rails can be run through the eight carriages and placed on the flatbed.
Such Flatbed Cart are not currently available in the Locomotive Factory. However, fortunately, they have produced many semi-finished freight carriages, which are only two Wheelset, front and rear, with a beam on the Carriage Floor mounted on the Wheelset. However, there is no Carriage Floor, let alone upright Carriage Wall. You can see the tracks below when you stand on the beam.
In other words, the keel and ribs that have just been laid out in the carriage have not yet been covered with meat and skin.
Such carriages are naturally unsuitable for carrying ore or people, and they can't even carry sleepers. However, this doesn't prevent them from carrying rails. Anyway, those things are long, stretching from carriage number one all the way to carriage number eight. Even if there are holes all over the bottom, they won't leak through.
Without further ado, Lin Fei, Luo Chong, and several researchers from the train project discussed and finally devised a plan: to take the Endeavor Model train out, attach eight semi-finished carriage trusses to the back for open-air transport of rails, then attach eight fully-fledged freight carriages filled with sleepers, and finally attach four Passenger-Cargo Carriage to transport Rail Spike, rail seats, Rubber Pad, and other accessories, as well as tools such as hammers, shovels, and picks, and personnel responsible for paving the track.
Lin Fei and the craftsmen and researchers at the research institute were extremely excited. The train they had produced was finally going to go out. Although it was destined to run less than ten kilometers today, since it was only going out to pull the rails, at least they could finally see this little guy go out. Everyone was still very excited.
When the Endeavor Model vehicle was launched for the first time, Lin Fei volunteered to be the first driver. He walked around the front of the vehicle and directed the craftsmen to check everything. He added oil where it needed to be added and coal water where it needed to be added. He also personally checked all the operating systems and then started the boiler.
The engine of the Endeavor Model locomotive is very small, only about half a person's height, and the driver's seat is also not large. Therefore, this type of locomotive does not have a driver, co-driver, or Stoker. There is only one driver and one co-driver. Generally, one person is enough to control the train, as well as add coal and water. The co-driver is purely for the purpose of preventing accidents.
Lin Fei didn't look for a co-driver; he did the work of both the Stoker and the driver. Although his hands were covered in soot, he was busy and happy. Before long, the water in the boiler tank boiled, producing a large amount of steam. This steam was then reheated by numerous flue Guan He and exhaust pipes, turning it into superheated steam. Finally, the valves were released, and the steam surged into the cylinders on both sides of the front of the vehicle.
Boom--
Steam rushed into the cylinder, pushing the piston, which in turn drove the connecting rod, causing the three pairs of drive wheels to turn forward half a circle. The entire locomotive suddenly jolted and lurched forward half a meter.
The onlookers were thrilled; this 'big guy' had actually come to life.
Waaah————
Lin Fei suddenly sounded the whistle, and the locomotive immediately let out a sharp whistle. He stood in the driver's seat and shouted, "Get out of the way, the train is leaving the station!"
He was as happy as a child playing with a big toy. He put away the whistle, opened the gas valve again, and steam flowed into the cylinder again. The train began to move slowly forward.
Whew—Whew—Whew—Whew—
Puffs of white steam billowed out from both sides of the wheels, and the prototype of the Endeavor Model finally drove out of the workshop where it was manufactured.
Outside the workshop, the four slaves who had been gathered there to move sleepers and rails suddenly looked towards the workshop with bewildered expressions. After the guards and foreman told them to wait there, they went into the workshop together. Soon after, a lot of noisy voices came from inside, as if the people inside were very excited. Then, suddenly, a shrill shriek that didn't sound like a human voice rang out. It was unclear what was making the noise, but it was very loud. Then, a continuous stream of smoke billowed out of the workshop entrance. Anyone who didn't know better would think there was a fire inside.
The slaves were bewildered. They knew that this city was the base for Iron Smelting of the Han Tribe, and they also knew that the workshop of the previous Steel Rolling Mill contained a lot of steel rails. But they didn't know what was in this workshop. They only knew that the railway they were going to build would extend from the ground of this large workshop.
So, there must be something important inside, otherwise why would they spend so much manpower and resources to build a railway to this big house?
Just as they were puzzled, another piercing shriek rang out, and a group of craftsmen and guards suddenly ran out of the workshop. Everyone's eyes were fixed on the deep workshop entrance, as if something was about to emerge.
Accompanied by a wisp of white mist, a red and black steel monster suddenly burst through the fog, its feet on steel wheels, roaring and sparking as it charged out of the workshop entrance.
(3/3) Adding to yesterday's post