Aside from a few minor details, Lin Qi was basically satisfied with the First Phase Project.
Although he would not be living here, Nick and the other supervisors could gain experience from constructing this place and provide better service for his shelter on the equator.
Construction on the equatorial shelter had not yet begun, but its location had already been chosen. It was situated on the outskirts of a medium-sized active volcano within Nagaril.
It was more than thirty kilometers from the volcano, to avoid the various disasters and calamities that might occur if it erupted.
Geologists believed that when the Ice Age arrived, the world's geological environment would undergo massive changes, and some volcanoes would enter active phases.
The shelter currently being built within the Federation was not too close to the volcanic vent, either. It was located at a safe distance.
The power supplied by the Geothermal Generators was already more than enough for the numerous electrical devices in the First Phase Project, with plenty left over.
Moreover, this was only one group of Geothermal Generators. If they were all put into operation, maintaining the shelter's daily power supply would not be a problem.
The shelter would also implement phased power restrictions to ensure that the electrical load did not exceed its limits. Combined with Human-powered Generation, there would not be any major problems.
It was cold enough outside to kill, yet the shelter's interior was as warm as late spring or early summer, staying at a little over twenty degrees.
A massive amount of heat was being conducted in, and the steam surging through some of the pipes made the entire shelter feel extremely warm.
The soil itself was an excellent insulating material, which solved the shelter's heating problem.
Lin Qi lived in the shelter for three