The properties of this material are undoubtedly extremely superior.
Furthermore, this material can be used not only in Space Elevator, but also in other areas where it plays a vital role.
For example, warship armor.
If we add this material to the armor layers of a warship, acting like the reinforcing steel in concrete, how high would the armor strength of the warship be? And how much would its survivability be improved?
How much will its stability and reliability be improved when applied to the manufacture of various industrial equipment?
No matter how you look at it, this material has the potential for large-scale application.
But there is one problem.
Its production is too low.
Even the large-scale mass production line that Li Qingsong planned—a production line that is extremely large in scale and has extremely complex technology, with a single production line probably requiring more than 100,000 square meters of land, equivalent to a large factory—can only produce about 2,000 cubic meters of this material per day on average, with an annual output of about 730,000 cubic meters.
This material is very light, only about one-thousandth the weight of water, so the annual production is only 730 tons.
This production capacity seems high, but to build Space Elevator on Ganymede, its diameter would need to reach 10 meters and its length would need to reach approximately 45,000 kilometers.
In this way, the volume of the Space Elevator itself would reach approximately 3.534 billion cubic meters. Even if the production line operated at full capacity, it would take about 5,000 years to produce enough to build one Space Elevator.
This is clearly unacceptable.
However, due to the current level of technology, the production capacity of a single production line cannot be increased any further.
If it were humans facing this situation, their only options would be to continue trying to improve the process and enhance the performance of the material, attempting to build Space Elevator using less of the material, while also trying to increase production capacity and produce more material.
But Li Qingsong is different.
Would it take a production line 5,000 years to produce enough materials?
Doesn't this mean that if I had 1,000 production lines, it would only take five years?
If I build 2,500 production lines, it will only take two and a half years.
Since that's the case, what else is there to say? Let's do it!
In any case, all kinds of basic industrial facilities are now complete, steel production capacity is extremely abundant, electricity is extremely abundant, and all resources are extremely abundant.
Thus, under Li Qingsong's plan, preliminary leveling began on a vast plain covering 300 square kilometers on Ganymede.
Compared to Li Qingsong's current population of only 15 million, undertaking construction on an area of 300 square kilometers seems somewhat impractical.
But don't forget that Li Qingsong's Industrial AI has been trained for many years, and the data used for training all comes from real factories, with extremely high quality and a huge quantity.
Moreover, in actual large-scale use, it has been constantly iterating and improving.
Although his most advanced chip at the moment is only 20 nanometers, far inferior to the 2-nanometer Silicon-Based Chip and more advanced quantum computers in the human world, Li Qingsong dares to say that this set of industrial and Construction AI is far superior in performance, even compared to the most advanced and intelligent human AI.
At this moment, tens of thousands of excavators, bulldozers, trucks, mixers, and other vehicles produced by Ganymede and capable of working well on Ganymede's land have been temporarily taken over by Transportation AI under the unified command of Jade Emperor AI and have arrived at the construction site using intelligent driving mode.
Once the transportation was completed, the Construction AI took over and began controlling these intelligent vehicles to work on Ganymede's desolate land.
Hundreds of thousands of clones have also joined the effort. Some of them perform complex tasks that AI cannot accomplish, while others take on responsibilities such as system maintenance, remote control, and decision-making.
The initial leveling and reinforcement of 300 square kilometers was completed in just over two months.
At this time, numerous building materials from the other factories, including special concrete used to isolate the ground from the factory buildings, steel used to build the factory buildings, pipes used to transport liquids, wires used to transmit electricity, and even maintenance spare parts for various processing machinery, food for the clones, Spacesuit they wear, water they drink, and so on, were all transported directly by a massive fleet of vehicles and Railway Line controlled by the Transportation AI.
Resources, as numerous as mountains and as vast as the sea, converged here. Along with the resources, a surge of electricity and the boundless computing power provided by the supercomputing base also arrived.
In the incredibly efficient construction, all sorts of buildings sprang up like mushrooms after rain on the once desolate and lifeless land.
Factory buildings, highways, laboratories, Processing Room...
Ultimately, after two and a half years, Li Qingsong completed the construction of the production base for this material, which was named Zero Fiber.
A total of 2,500 production lines, along with their supporting facilities, including power plants, supercomputing bases, maintenance and support bases, were completed.
With the powerful electrical supply from the Nuclear Fission, 2,500 production lines started operating simultaneously.
Each production line contains six million wire drawers, and each wire drawer can draw 20 meters of these fine wires with a diameter of only 50 micrometers per second, which are barely visible to the naked eye.
One wire drawing machine can produce about 1.72 million meters of this thread per day.
Six million wire drawing machines working simultaneously produce six million wires, each 1.72 million meters long, which are then wound together to form a thick cable with a diameter of about 7 centimeters.
With 2,500 production lines, it can produce 4.3 million kilometers of this cable with a diameter of about 7 centimeters every day!
At this moment, nine standard-sized cables, each 5,000 kilometers long, were welded together using a special welding method.
Its total length reaches 45,000 kilometers, but its total mass is only about 170 tons.
With the large-scale production of Zero Fiber, the construction of the Space Elevator also began simultaneously.
The equator, where Ganymede's orbital speed is fastest, is the location where the Space Elevator would require the shortest cable length. Li Qingsong selected a suitable location for building the ground terminal of the Space Elevator, taking into account factors such as geology, the distance to Mining Base, and industrial clusters.
The massive construction project has begun again.
Here, Li Qingsong dug a huge pit with a diameter of 20 meters and a depth of 10,000 meters.
At the bottom of this huge pit, Li Qingsong began horizontal excavation and eventually unearthed a fixed underground layer covering an area of 300,000 square meters beneath the thick rock and ice layers of Ganymede.
One end of the Space Elevator cable extends here.
Here, Li Qingsong resumed construction, using a massive fixing device to secure one end of the cable, while simultaneously pouring large amounts of reinforced concrete to re-fix the device in place.
In this way, the Space Elevator can rely on the rock and ice layers on Ganymede that are 10,000 meters thick to stabilize itself, without having to worry about being pulled away.