When the Northeast is covered in ice and snow.
Winter is also beginning to set in on the Hetao Plain. In the Ula Mountain in the eastern part of the Hetao Plain, the plain ends at the confluence of the Yellow River's Hetao Region section.
At this moment, Fang Heng, who was in charge of the work in the area, looked at the temperature data and the situation of floating ice on the river surface reported back from various places upstream, and knew that the Yellow River's autumn and winter ice jam flood was coming soon.
"Notify everyone to begin blocking the river according to the previous plan."
"Clear."
The sharp ringing of the bell signaled the orderly movement of the militia and Engineer Corps, who swiftly sprang into action according to plan.
On the north slope, huge iron cages, already filled with Stones and sandbags, were being pushed down the slope by Steam Bulldozer.
The iron cage slid down the slope into the river.
Splash! The iron cage, a cube with sides of 2 meters, fell into the river but was not submerged; a small portion of it remained above the surface.
At this time, the runoff of the Upper Yellow River is approximately 40 to 60 billion cubic meters, accounting for about 50% of the total annual runoff of the river.
However, the Yellow River's water flow is concentrated in the summer, with less than One Tenth its flow occurring in winter.
In winter, the river is only about 1.5 meters deep, which is why the river is blocked in winter, as the water level is low at this time.
As iron cages were piled up in the river channel, the 762-meter-wide river was quickly blocked by three iron cage barriers.
Of course, because there are gaps between the iron cages, water can still flow through them.
The militia and Engineer Corps, who were already prepared, pushed wheelbarrows and poured bags of sand into the riverbed. The area where the sandbags were poured was the area between the three iron cage dams.
On the first iron cage target, Fang Heng could already see the river water slowly rising, but after the water calmed down, a thin layer of ice began to appear.
He made a decisive decision. "Start building the Ice Dam."
The Dry Ice factory had been operating at full capacity for several days and had already stockpiled more than 200 tons of Dry Ice. This Dry Ice was thrown into the river and quickly froze a stretch of the river surface, several tens of meters long, before the first iron cage dam, and even the riverbed was frozen.
"Continue pumping water to make ice."
Steam Pump draw water from the upstream river and pour it onto the ice surface, along with continuously added Dry Ice.
In less than five hours, an Ice Dam 15 meters high, 100 meters wide, and 800 meters long appeared before the first iron cage dam, blocking the Yellow River.
However, Fang Heng did not stop, because the Ice Dam not safe and had to be expanded.
However, the Ice Dam body will then bulge upstream from the center of the river channel, forming Arch Dam shape, which will transmit the pressure of the Ice Dam to the mountains on both sides.
The iron cage dam and sandbag dam behind the Ice Dam will continue to be constructed and reinforced, with the plan to form a dam with a length of 1200 meters, a width of 200 meters, and a height of 25 meters.
Of course, both Ice Dam and earthen dams are temporary structures used for a few years.
The main purpose is to raise the water level of the Yellow River in the Hetao Region section by about 5 meters. Once the water level reaches 5 meters, the dam of the Northward Canal can be dug to guide the Yellow River to scour the Northward Canal.
Ice Dam offer the best cost-performance ratio.
After all, once the Northward Canal is completely eroded, the pressure on the dam at the mouth of the Ula Mountain River will naturally decrease.
For a week straight, the thickness, height, and width of the Ice Dam increased rapidly.
Meanwhile, the Yellow River in the Hetao Region is rising rapidly, with the water level now exceeding 3.7 meters, submerging large areas of low-lying land along the banks.
At the location of Uliangsu Lake in later generations, the river water rushed in rapidly, and the lake was created more than a thousand years earlier.
December 16th, Year 5 of the New Calendar.
Temperatures in the Hetao Region dropped to -12 degrees Celsius, which greatly intensified the construction and maintenance of Ice Dam.
After more than half a month of water storage, the water level of the Yellow River in the eastern part of the Hetao Plain has risen to 8.3 meters.
Near the Northward Canal, the Yellow River's water level also rose to 5.5 meters.
Gu Qiuxin, who had been watching closely, knew they couldn't wait any longer. "Dig up the dam!"
Boom! The dam was Explosion by explosives, creating a small hole.
Suddenly, the surging Yellow River waters, like ten thousand galloping horses, squeezed through the gap, and the dam was quickly breached.
The icy cold water flowed northward through the narrow and loosely constructed channel.
The Northward Canal is 176 kilometers long and has an average width of only 5 meters, which greatly increases the flow velocity of the water.
In less than 15 hours, the river water rushed into the Hanhai Lowland Hanhai Lowland, whose average elevation is only 800-1000 meters, while the elevation of the Hetao Plain is 900-1200 meters.
At the intersection of the Northward Canal and the Yellow River, the elevation is around 1100 meters.
This creates a height difference of at least 100 meters between the two sides.
The Northward Canal, which was already composed of rock and soil layers, was further eroded by gravity, causing the sides and bottom of the Northward Canal to widen and deepen.
As time went on, the water level of the Yellow River in the Hetao Region did not drop much, but it also did not continue to rise.
Clearly, the river water flowing in from upstream was absorbed by the Northward Canal.
However, this is only the winter flow. It should be noted that the winter flow of the Upper Yellow River is only about 5 to 9 billion cubic meters, while the real bulk comes in during the summer.
The continuous flow of river water rushes into the Hanhai Lowland, quickly forming a series of lakes in the low-lying areas.
At the same time.
Downstream from where the Ice Dam blocked the river, the river, which already had little water in winter, became even sparser, with some sections even drying up completely.
Near the Ancient Jiuyuan Ruins (now Baotou) on the west side of the Yunzhong Plain (Tumed Plain), the construction of the Yunzhong Dam began, following the terrain.
Because the upstream has blocked the water, only ice remains in the riverbed here.
18,000 laborers who were previously assigned to support the Northward Canal project were transferred here to begin construction of the Yunzhong Dam.
However, the Yunzhong Dam is not high, only about 80 meters high. It adopts a gravity dam design and the maximum designed water storage height is only 45 meters.
This was mainly due to considerations of the workload and safety; Tang Feilin did not give much thought to the shipping value of the Middle Yellow River.
In fact, the shipping value of this area will only be redeveloped once the cascade reservoirs in the Middle Yellow River are completed. At most, more transfer stations will be built, and transportation will be carried out through a relay of ships.
As for the lock elevator plan, that's something to consider in the future; there's no need for it now.
In recent years, no water from the Middle Yellow River has entered the middle reaches.
The Yellow River, through the Northward Canal, continuously delivers its waters into the Hanhai Lowland, along with a large amount of silt. This silt is not present in the upstream river itself, but rather comes from the loose soil layer of the Northward Canal.
Even if the river doesn't want to erode the riverbank, the Gu Qiuxin will accelerate it artificially, for example, by burying explosives on parts of the riverbank to loosen the soil.
Before we knew it, more than four months had passed.
At this time, the Northward Canal was widened to about 80-120 meters, and its depth was about 6.7-89 meters.
In the Hanhai Lowland, more than 1.8 billion tons of silt were washed over, forming a vast alluvial plain, along with a total of 4.1 billion cubic meters of river water.
But that's not all.
Because the Upper Yellow River have begun to thaw, the winter and spring ice jam floods are approaching.
There will be billions of cubic meters of river water, but the amount of sediment will be much less because the riverbed will not erode indefinitely. In particular, as the riverbed widens, the water flow will slow down, which will reduce the erosive effect of the water.
However, the impact of ice jams during the winter and spring seasons will not be significantly reduced.
As the Northward Canal continues to widen, the water level in the Hetao Plain is gradually decreasing. However, with the arrival of the summer flood season, the water level will not drop much further.
Fortunately, the earthen dam behind the Ice Dam was already completed, so there was no need to worry about the Yellow River water flowing downstream after the Ice Dam melted.
At that time, hundreds of billions of cubic meters of river water will form a new river in the Hanhai Lowland.
Or rather, the river was already forming.
In the western part of the Hanhai Lowland, a river flows through the Gobi Desert, Sandy Land, and grassland.
The three airships flew swiftly westward along the river, finally reaching its end— Juyanhai Lake.
Juyanhai Lake is the lowest point of the Hanhai Lowland and a lake fed by the Ruoshui River in the Hexi Corridor. At this point, the Yellow River's channel is connected to Juyanhai Lake and the Ruoshui River.
Although less than 500 million cubic meters of river water flowed into Juyanhai Lake, the Juyanhai Lake itself was only about 80 square kilometers in area and Water Storage Capacity of about 80 to 170 million cubic meters.
The river flow instantly more than doubled the size of the lake.
Besides the river flowing westward into the Hanhai Lowland, a small portion of the water also flows northeastward, but it does not reach the Hulunbuir Grassland, mainly because the water volume is insufficient.
However, the arrival of the summer flood season is something to consider.
However, to extend the Yellow River northeastward into the Hanhai Lowland, it is impossible to rely on natural flow; artificial guidance and utilization of seasonal rivers in the eastern part of the Hanhai Lowland are necessary.
However, the existence of this canal is extremely important.
This means that large steamships could travel downstream from Lingwu Prefecture on the Yinchuan Plain, through the Hetao Plain, and then into the Hanhai Lowland, thus reaching Juyanhai Lake to the west and the Hulunbuir Grassland to the east.
Thank you everyone for your support! (ω`)