Skip to main content
  • Home
  • Library
  • Read
    • Popular
    • Charts
    • Browse
    • Categories
    • Wikis
    • Glossary
  • Request
  • Activity
  • Leaderboard
  • Help
Our Apps
  • DaoSearch
  • Narratorr
Social
  • Discord
  • Patreon
Nano Rise
Chapter 439

Breakthrough

1,403 words 5 min read 0 views 4mo ago Source ​
Skip to the end of the chapter
Prev
Next

November 26th.

The Qiongzhou Strait, located in the Southwest China corner of Xuwen County.

About 17 kilometers off the coast of Lighthouse Cape, at the construction site of the first phase of the Qiongzhou Strait Undersea Tunnel, all construction workers are inside special safety vehicles.

Huang Xinming, chief engineer of Flying Roc Project, and Li Feng, deputy chief engineer of China State Construction, stared at the simulated screen of the operation interface.

Because the undersea tunnel was excavated from both ends toward the middle, the 37-kilometer-long Qiongzhou Line 1 has a 33.6-kilometer section located underwater, with the two ends meeting at the 16.8-kilometer mark.

After more than a year of intensive construction, considering the geological conditions that the silt layer was prone to collapse, the construction team adopted a pipe jacking method in conjunction with a tunnel boring machine after breaking through the land rock layer area.

On average, we can advance 50 to 60 meters per day, and today is finally the day when the two ends meet.

The section of the tunnel from Lingao County has been completely halted, awaiting the excavation of the final 10 meters of mud and sand in the Xuwen County section.

"5 meters, temporary pipe jacking to follow!" Li Feng shouted nervously.

"Receive."

The temporary jacking pipe, made of super materials, slowly advanced forward along with the tunnel boring machine, powered by eight hydraulic presses.

Behind the pipe jacking is a huge alloy barrier net, designed to prevent sudden collapses in front of the construction site from being impacted by seawater carrying large amounts of mud.

Behind the silt barrier net, hundreds of workers are busy at work, all equipped with specially made exoskeletons, which are custom-designed diving exoskeletons.

Even if there is a sudden collapse in front of them, they can survive in the seawater. Last month, a collapse occurred in the Lingao section, and a large amount of seawater rushed into the construction area. The workers successfully evacuated from it using exoskeletons and specially made safety vehicles.

The construction of the Qiongzhou Strait Undersea Tunnel has accumulated a wealth of experience and technology for tunnel construction under complex geological conditions in China. This experience and technology can be applied to the construction of undersea tunnels in other regions in the future.

Time ticked by, second by second.

The tunnel boring machine and pipe jacking equipment moved slowly forward, while workers quickly laid the pipe walls.

4 meters...

3 meters...

The moment the last few tens of centimeters of temporary cement layer were cut open and pushed down by the tunnel boring machine.

The surveillance cameras deployed in the Lingao section clearly recorded this scene, which was then simultaneously transmitted to the security vehicle.

"We did it!" Huang Xinming, who had been silent all along, shouted with a raised arm.

"Very good!"

"We did it!"

"Ha ha..."

Many people wept with joy, or were so excited that they became incoherent.

As the final 10 meters of soil were broken through, the engineers and workers snapped out of their excitement and began the final finishing touches.

The tunnel boring machine continued to China Mobile slowly southward, and the workers spent more than three hours connecting the final pipe section.

Stepping out of the safety vehicle, Li Feng looked at the enormous tunnel, the largest and most challenging underwater tunnel ever constructed by humankind.

Standing at the bottom of the tunnel, Li Feng felt as if he had entered a land of giants.

"Absolutely stunning!" Huang Xinming, standing to the side, also exclaimed in admiration.

Because of the use of the casing method, they have only completed the outer casing so far, and there is still an inner casing to go. The inner casing does not require the excavation of tunnels or the collapse of soil and rock layers, so the construction speed is very fast. Currently, 31 kilometers have been built, and only the last 6 kilometers are left.

Li Feng put on his helmet to ease the tightness in his chest. "The outer tube is finished. The inner tube should be able to close in about two months."

"We need to prepare for the next step of our work," Huang Xinming said as he returned to the safety vehicle.

The successful closure of the outer pipe and the near closure of the inner pipe do not signify the completion of the work; they still need to consider the construction of the ventilation well.

Ventilation is a crucial issue for ultra-long undersea tunnels, unless they are designed for railway use only and not for road traffic, in which case ventilation is not a concern.

The interior of the undersea tunnel is very sealed, and the average depth of the Qiongzhou Strait Undersea Tunnel is 150 to 180 meters below sea level, with a length of 37 kilometers.

Once a large number of vehicles enter, the engines need to burn fuel, which will cause a large amount of oxygen to be consumed inside the tunnel, while exhaust gases will increase rapidly.

If natural ventilation alone is not enough to meet the oxygen consumption inside the tunnel, oxygen deficiency will soon occur.

The lack of oxygen inside the tunnel means that, apart from electric vehicles which can still function normally, fuel-powered vehicles will stop working, and the drivers and passengers inside could suffocate.

It's impossible to equip every vehicle entering the tunnel with an oxygen cylinder!

The scene was too beautiful to imagine.

To maintain normal gas composition inside the tunnel, constructing ventilation shafts is an essential task.

The safety vehicle drove north, and Huang Xinming and Li Feng arrived at the No. 001 ventilation well. The design of the ventilation well was not to set it directly on the outer pipe, but to first open a horizontal longitudinal pipe.

The horizontal longitudinal pipe is 12 meters in diameter and 500 meters in length. It also features an inner and outer pipe design and has three gates inside, which can separate the ventilation shaft and the tunnel in an emergency.

Inside the horizontal longitudinal pipe, there are air inlet pipes and exhaust pipes. Forced ventilation is achieved by an electric motor. The diameter of the air inlet pipes and exhaust pipes is 1.5 meters. Two air inlet pipes and two exhaust pipes are arranged in one ventilation well.

The intake and exhaust pipes extend from one end of the horizontal longitudinal pipe to the ventilation platform on the sea surface. To maintain the balance of the ventilation well, a 200-meter-deep balancing anchor is installed below the horizontal longitudinal pipe.

Huang Xinming entered the construction site of ventilation well No. 001. The ventilation well is almost finished. As long as the ventilation platform from China Shipbuilding Industry Corporation is delivered, it can be connected.

The Qiongzhou Strait Undersea Tunnel requires a total of 8 ventilation shafts, 6 of which are on the sea surface and 2 on land.

Four ventilation wells would normally be enough, but for safety reasons, the number was doubled, just in case.

Although the probability of a major earthquake is relatively small, it is not impossible. Moreover, Qiongzhou is a typhoon-prone area. In the event of an accident at the ventilation platform, normal ventilation inside the tunnel can be ensured through the backup ventilation well.

Huang Xinming inspected the area and found nothing wrong. He turned to Li Feng and said, "There's nothing wrong here. Let's go check the internal pipe construction area."

"Okay." Li Feng nodded and recorded the status of the ventilation well on the tablet computer.

The safety vehicle continued north, passing through a network of internal tunnels where hundreds of workers, wearing exoskeletons, were silently busy at work.

The internal pipeline is actually a superhighway.

However, since it's underwater, there are many more things to consider.

For example, lighting systems, emergency systems, rescue systems, and fire extinguishing systems must all be considered.

During the design process, the engineers and designers still felt that the inner and outer shells were insufficient, so they added a watertight compartment design option.

If, by chance, a section of the pipeline, including both the inner and outer pipes, ruptures, a watertight hatch can be used to separate the ruptured area from the normal area.

In addition, emergency escape routes were designed using the horizontal longitudinal pipes of the ventilation wells. In an emergency, these four ventilation pipes can be turned into escape routes for personnel to leave, or into access routes for rescue personnel.

The designers and engineers have taken into account all possible unforeseen circumstances to ensure that the Qiongzhou Strait Undersea Tunnel can be used safely for more than a century.

Thank you everyone for your support! (ω`)

End of Chapter
PrevPreviousNext
NovelSummaries

Comments

No comments yet.
AboutStatsAPIChangelogStatusContactPrivacyTermsDMCA
© 2026 RandomTranslator·v3.27·RSS