Skip to main content
  • Home
  • Library
  • Read
    • Popular
    • Charts
    • Browse
    • Categories
    • Wikis
    • Glossary
  • Request
  • Activity
  • Leaderboard
  • Help
Our Apps
  • DaoSearch
  • Narratorr
Social
  • Discord
  • Patreon
Nano Rise
Chapter 600

Power Station

1,379 words 5 min read 0 views 4mo ago Source ​
Skip to the end of the chapter
Prev
Next

October 8.

In the first week of October, two lunar spacecraft arrived at the Moon Palace Base.

However, the two spaceships did not land in the port area, but instead chose to land in an area about 45.6 kilometers southeast of the Moon Palace Base.

The spacecraft landed at the Rainbow Bay Plain No. 1 Thermal Well, which was clearly intended for the construction of a power plant.

Fang Hong and Sun Silu, two electrical engineers who had arrived at the Moon Palace Base earlier, arrived at the Rainbow Bay Plain No. 1 Thermal Well, led by temporary driver Shi Keji.

The two lunar spacecraft, weighing a total of 182 tons, are divided into eight modules. Excluding the two power modules, the remaining six modules are functional modules.

After delivering the two people to the side of the spaceship, Shi Keji did not stop. Instead, he turned up the throttle, increasing the speed of the off-road vehicle to 22-26 kilometers per hour, and returned to the main base.

Now that it was moonlight again near the base, he returned to the base after about two hours.

Then, they loaded up a large number of specially made cables and composite pipes made of lead and foamed silicon steel, and drove off-road vehicles back the way they came to the Rainbow Bay Plain No. 1 Thermal Well.

However, his destination was not the Rainbow Bay Plain No. 1 Thermal Well. After driving for about six kilometers, he saw Li Jianxian working on the project.

The construction is actually quite simple; it involves operating a small canal digger to excavate a canal that is 1 meter deep and 0.4 meters wide.

Shi Keji's job was to install foamed silicon steel lead pipes and cables, and then bury the pipes.

The cables are laid underground. The reason for this complicated process is that the solar wind, cosmic rays, and static electricity on the lunar surface would make the cables, if laid directly in the open, susceptible to interference.

It's important to know that this cable is intended for use in industrial areas. Industrial production requires uninterrupted power supply 24 hours a day, especially in the metallurgical and electrolysis industries. A sudden power outage could cause equipment malfunctions and product failures.

Therefore, this cable adopted a lead composite conduit and underground laying scheme to ensure stable power supply.

The Moon Palace Base is expected to complete the laying of this 45-kilometer cable in one month. If it weren't for the limited manpower and equipment, and the need to construct multiple sections simultaneously, the laying could be completed much faster.

Unfortunately, the Moon Palace Base currently only has 12 people, and with the need for rotation, many tasks are beyond their capacity, so each person has to take on multiple roles.

Let's turn our attention back to the Rainbow Bay Plain No. 1 Thermal Well.

Before arriving, Fang Hong and Sun Silu had prepared a construction plan, and now that the equipment has arrived, they can immediately begin working in an orderly manner.

First, they need to conduct a drilling test to determine the specific temperature layer, which will facilitate subsequent drilling.

The improved internal circulation liquid cooling system allows the drill bit to work for extended periods, and the drill bit material has also been improved.

The drilling speed of current drilling rigs reaches about 8 to 10 meters per hour.

The surface of the lunar maria is composed of lunar regolith, while the hard rock layers extend to depths of about 20 meters. On the first day, the drilling reached a depth of approximately 213 meters.

However, it's still over a hundred meters away from the suitable temperature zone.

Fang Hong was in charge of drilling, while Sun Silu was responsible for preparing the thermoelectric power generation pipeline.

According to the design, the power plant has a generating capacity of 15,000 kilowatts, and the power of a single thermoelectric generator pipe is 1,000 kilowatts, so 15 thermoelectric generator pipes are needed.

In fact, the thermoelectric power generation pipeline is not long. The assembled length is 20 meters and the pipeline diameter is 12 centimeters. It can operate for a long time in a temperature range of 400~500 degrees Celsius.

As for the other parts of the pipeline, apart from the cables, they are all foamed silicon steel pipes manufactured by the Moon Palace Base itself.

The next day at noon.

The sky and the surrounding ground were still pitch black.

Fang Hong finally saw the suitable temperature layer on the temperature detector behind the drill bit. Starting at a depth of 312 meters underground, the temperature exceeded 400 degrees Celsius.

As the drill bit continued downwards, at a depth of about 357 meters, the temperature reached approximately 500 degrees Celsius.

Therefore, it can be determined that the optimal power generation temperature layer is located in the area of 312 to 357 meters underground, and he finally decided to locate the power generation pipeline in the area of 315 to 335 meters underground.

"I've determined the power generation temperature layer on my end, what about yours?"

Sun Silu immediately responded on the shortwave channel, "I'm all set on my end too. The foamed silicon steel pipes that Keji saved yesterday are enough to assemble a power generation pipeline."

"Okay, I'll leave this to you. I'll go drill the next well."

"No problem."

Sun Silu started the trolley and pulled a piece of equipment to well No. 101. The equipment was similar to a metal cylinder, about 2.4 meters high and 1.6 meters in diameter.

This is the ground section of the generator set. Sun Silu inserted a 1-meter-long thermoelectric power generation pipe into it, then pressed the switch, and the thermoelectric power generation pipe slowly descended.

Then came the second quarter, the third quarter...

After the twenty sections of thermoelectric power generation pipes were assembled, the next step was to assemble the foamed silicon steel pipes, also section by section.

After a quick fast food meal in the evening, Song Silu continued working until after 8 p. m., when the last section of foamed silicon steel pipe was finally assembled.

In fact, the diameter of the foamed silicon steel pipe is much smaller than that of the thermoelectric power generation pipe, only about 2 centimeters in diameter. The main purpose is to hold the power generation pipe in place. Fortunately, the moon's gravity is relatively low, which reduces the gravitational effect of the material's own mass.

After completing the underground section, he tested the power generation effect, and the output power stabilized at 1 kilowatt per hour, which met the design power.

The power plant is being gradually improved, with one thermoelectric generator added every two days.

It is estimated that the construction of the Rainbow Bay Plain No. 1 Thermal Well will be completed around November 10th. Next, the Rainbow Bay Plain No. 5 Thermal Well and Rainbow Bay Plain No. 8 Thermal Well in Hongwan Plain will be built, forming a geothermal differential power generation cluster with a total power generation capacity of 57,000 kilowatts.

In fact, the geothermal energy in the edge area of Rainbow Bay Plain is very abundant. However, due to material limitations, the thermoelectric materials required for thermoelectric power generation cannot operate in environments exceeding 627 degrees Celsius.

Especially in underground environments with relatively high pressure, in order to ensure that the thermoelectric power generation system can operate stably for a long time, only the temperature range of 400 to 500 degrees Celsius can be selected, which greatly reduces the power generation efficiency.

If underground hot wells with temperatures around 1000 degrees Celsius can be utilized, the geothermal energy development potential of the Rainbow Bay Plain will be increased to 3 to 5 billion kilowatts per year.

Unfortunately, thermoelectric materials cannot withstand such temperatures.

Many real-world problems, in essence, boil down to issues with materials.

If thermoelectric materials can withstand temperatures of 5,000 degrees Celsius, then even without solar energy, humans can still extract geothermal energy from deep underground.

Materials are an unavoidable issue in the process of technological development.

Many technologies are theoretically very mature, but they haven't entered mass production because of the obstacle of materials.

Before we knew it, it was October 13th.

At the launch site in Houston Space City, the Neptune VI Launch Vehicle is ready for launch.

Under the tense gaze of the crowd, the carrier rocket ignited and launched, the pale blue flames propelling the thousands of tons of weight into space.

Time ticked by, and finally, after the core stage and fairing separated, the launch vehicle successfully broke through the Kármán Line and entered low Earth orbit.

NASA and Boeing breathed a sigh of relief.

The most dangerous phase has finally passed, and the rest of the voyage will be relatively safer.

Thank you everyone for your support! (ω`)

End of Chapter
PrevPreviousNext
NovelSummaries

Comments

No comments yet.
AboutStatsAPIChangelogStatusContactPrivacyTermsDMCA
© 2026 RandomTranslator·v3.27·RSS