The integration of United Water in Tianshui has been initially completed. The Economic Supervision Office, which is responsible for internal reforms, has left its resident team behind and is heading to the next local water company.
The general manager of Tianshui Water Affairs was just transferred from the Chang'an headquarters after being investigated.
A crucial condition for the reform of United Water is that United Water management team will be completely stripped of their official positions.
This restriction is actually intended to reduce the number of politician-style managers working at United Water. They no longer have government-affiliated positions or even public sector jobs; they are purely corporate management.
This condition has caused a great deal of confusion for many people.
Joining United Water means facing significant restrictions in the future; they cannot be transferred to other state-owned enterprises or official agencies, and can only be considered managers.
From the very beginning of the collaboration, Huang Xiuyuan made it clear that he wanted to completely sever ties with the state-owned enterprise style.
If this is not done, the water company's management will still be on the payroll, and they will often be thinking about how to get promoted, how to maintain stability, and how to keep their positions.
The former head of the Tianshui water company refused to join United Water and returned to work at the Water Resources Bureau for this reason.
Yang Zhiye, who took over Tianshui Water Affairs, was a section chief at the former Chang'an Water Affairs, having worked within the system for nearly twenty years.
In this water affairs reform, because of his clean record, he was assigned to take charge of Tianshui Water Affairs and served as the general manager of Tianshui Water Affairs.
The former water supply office building was renamed United Water Tianshui Branch after the relevant work was taken over.
Inside the general manager's office.
Yang Zhiye, the heads of the two waterworks, the heads of various departments, Li Mingchu, the leader of the supervisory team, are having a meeting.
"After the initial reforms, everyone may find it difficult to adapt, but let me make this clear first: if the company becomes profitable, everyone will benefit. However, if anyone still harbors any old ulterior motives, Team Leader Li and I will not hold back."
From the very beginning, Yang Zhiye gave everyone a rude awakening.
"The staff at Tianshui Water Affairs is currently too bloated; everyone should be prepared for that."
Wu Hongbing, who was in charge of human resources, asked hesitantly, "General Manager Yang, how many people are going to be laid off?"
"The total number of employees is 861, and according to the plan, it will be reduced to about 400 within the next three years."
"What?"
"So much..."
"Isn't this a bit inappropriate?"
Yang Zhiye said calmly, "Reducing staff doesn't mean layoffs, but rather reassignment to other companies. However, let me make this clear beforehand: those underhanded tactics you used to employ, make it clear to your subordinates that if they happen again, you're fired."
"Clear."
"I will certainly give the order."
The department heads and factory managers breathed a sigh of relief; as long as they weren't fired, it wasn't too serious.
Li Mingchu, standing to the side, remained silent, only taking notes on the conversation, because they would not interfere with specific operations unless there were serious problems with management decisions.
Yang Zhiye pushed open a map of Tianshui, pointing to Qinzhou District in the city center and Maiji District next door:
"Currently, the Qinzhou Waterworks and Maiji Waterworks are experiencing significant water shortages. Water shortages occurred last summer, and it is estimated that with population growth and industrial and agricultural production, the pressure on Tianshui's water supply will become increasingly immense in the future."
Han Zhonghua, director of the Qinzhou Waterworks, nodded. "That's true. The infrastructure of the two old plants was built in the 1980s and 90s, and they are currently facing problems such as aging pipes and insufficient water storage in the reservoirs."
Yang Zhiye then said:
"Therefore, we must be prepared. First, we must prepare to build a sewage treatment plant to treat wastewater and allow it to be recycled back into the reservoir."
"Secondly, we began promoting wastewater discharge contracting projects to various enterprises, helping them achieve internal water recycling and reduce the proportion of industrial water use."
"Third, after the wastewater treatment plant and industrial water internal circulation are completed, we will begin a comprehensive upgrade of the water supply pipeline and gradually and systematically reduce groundwater extraction."
"Fourth, establish strategic water storage reservoirs, and construct cover layers for these reservoirs to reduce evaporation and pollution from Sandstorm."
These tasks will be carried out step by step. Yang Zhiye has calculated some of the situation of Tianshui Water Affairs. Last year, Tianshui's total water supply was 36 million cubic meters. For a region with a total population of 3.45 million, the per capita water supply was only 11 cubic meters per year.
If we further subtract water used for industrial and agricultural purposes, the estimated annual per capita water supply is around 6 to 7 cubic meters.
While the average annual water consumption per capita in the south is several hundred cubic meters, the average per capita consumption in Northwest China cities is not even a fraction of that.
It's not that people don't want to use it, nor that they can't afford it; it's that the local water resources simply can't supply it.
If calculated based on a potential of 100 cubic meters per person per year, Tianshui's water consumption potential is at least 345 million cubic meters.
Based on the current price of 2.6 yuan per cubic meter of water, the annual sales could reach around 900 million yuan. Adding the fees charged by industrial, agricultural, and commercial users, an annual revenue of 1.2 billion yuan would be a very conservative estimate.
Therefore, it is essential to promote wastewater treatment plants and the internal circulation of industrial water.
Yang Zhiye assigned various tasks and began preparing to find locations to build a sewage treatment plant and a strategic water reserve. At the same time, he planned to cooperate with Blue Era to entrust the filtered pollutants to Blue Era for treatment.
January 18th.
Tianshui, Qinzhou Waterworks.
Yang Zhiye and Han Zhonghua inspected the waterworks. The newly renovated water purification equipment and trace element additive equipment were undergoing trial operation.
Qinzhou Waterworks is one of the first waterworks under United Water to undergo water purification upgrades. There were only three slots available, all for cities with questionable water quality.
Yang Zhiye inspected the water purification situation. "Zhonghua, you need to do your job well. The sewage treatment plant can't be completed in a short time; it won't be operational until at least the second half of this year."
"I will cooperate with the company."
Since the sewage treatment plant is still under planning and construction, the water company has chosen a stopgap measure: connecting nearby sewage pipes to the waterworks' storage tank and treating the sewage through purification equipment.
The treated wastewater is then injected into the reservoir to increase its water storage capacity.
In addition, there are plans to make preliminary renovations to the sewage systems of nearby towns and villages, so that sewage can be transported to the waterworks.
According to calculations, if the plan goes smoothly, the Qinzhou Waterworks can process 30,000 to 80,000 cubic meters of sewage per day. This treated purified water will greatly supplement the water supply gap.
Before the renovation, the Qinzhou Waterworks supplied approximately 50,000 to 60,000 cubic meters of water per day.
After the renovation, the daily water supply can be increased to 80,000 to 90,000 tons, and the surplus purified water will be used as initial reserve water and injected into the reservoir.
After inspecting the Qinzhou Waterworks, he went straight to the Maiji Waterworks, where there is currently only a small water purification unit that can process 20,000 cubic meters of water per day.
Even a water purification device can greatly improve water quality.
The purified water, when mixed with the original tap water, neutralizes the tap water quality and significantly improves the overall water quality.
Just as Yang Zhiye was halfway through his inspection, his phone suddenly rang.
Hello!
"Mr. Yang, there's a problem with pipeline number eight in the city; it might have burst due to freezing."
"Organize personnel for emergency repairs immediately. I'll be there right away. Also, send a text message to inform them that the line is under repair and the water supply may be cut off for a day."
"Clear."
Thank you everyone for your support, and thank you to reader "Yang Shungang" for the generous donation (ω`)