Skip to main content
  • Home
  • Library
  • Read
    • Popular
    • Charts
    • Browse
    • Categories
    • Wikis
    • Glossary
  • Request
  • Activity
  • Leaderboard
  • Help
Our Apps
  • DaoSearch
  • Narratorr
Social
  • Discord
  • Patreon
Nano Rise
Chapter 95

Drought Conditions (Continued)

1,367 words 5 min read 1 view 4mo ago Source ​
Skip to the end of the chapter
Prev
Next

"Do you know Nanshan?"

Xin Nanshan hurriedly asked, "Is it the Blue Era that contracts for sanitation and water supply?"

"This is the company. Do you want to go and give it a try?" Xin Ailian asked.

With mixed feelings, Xin Nanshan nodded. He naturally had his own thoughts, after all, he was a user of the Shiguang Blog and had some understanding of the various companies in the Suiren Group.

The next day, he prepared his electronic resume and submitted it to Blue Era's Shandong Province branch.

On the other side.

Zhao Xiaojun and Meng Jianye arrived in the northern part of Dongying, where the Dongying Northern Water Conveyance Pipeline is under construction.

According to the plan, the section of the pipeline currently under construction leads to a reservoir in the Northwest China direction.

However, they now need to speed up the water pipe laying, so they can no longer use the previous buried pipe method and must use the ground-level method instead.

As for the freezing problem in northern winters, pure water flowing at high speed will not freeze severely due to the high speed and the lack of condensation nuclei.

However, just in case, the new silicon nanotubes can actually be fitted with an insulation layer, and the insulation effect is excellent. This is because the insulation layer designed by Snail Industry uses a vacuum insulation layer, which is almost like a thermos.

When will the equipment from Weifang Machinery Factory arrive?

Meng Jianye glanced at his watch. "They should arrive around noon today. They've already transported a batch of equipment and pipes over the past few days, and today the last batch arrives, so construction can begin."

The construction company under the water company was either familiarizing themselves with the equipment or pouring concrete foundations. A week ago, after being notified to change the construction method, they stopped digging underground ditches.

The concrete base is a structure that Chang 12, 4 meters wide, 5 meters high, and 5 meters deep underground. It is made of solid concrete and reinforced steel and cast in one piece.

Depending on the strength of the water pipeline, a pipeline base is usually installed approximately every 80 meters.

Eight foundations have been poured so far, and 20 foundations are still under construction. The eight foundations together are about 640 meters long.

The water pipeline has an inner diameter of 3 meters and is made of low-carbon steel with excellent ductility, then coated with a silicon nano-coating, making it about 2.1 to 2.3 times stronger than manganese steel.

If stainless steel water pipes of the same specifications are used, the wall thickness is almost three times thicker, and the weight is an astonishing 4.8 times.

Keep in mind that this is a pipe with an inner diameter of 3 meters; if modified, it could easily be used as a room.

If stainless steel pipes are used, the weight requirements for engineering machinery will be exceptionally high.

At the interface of the underground water pipeline, the construction team reserved an area to build a booster station. For this type of pipeline water transport, the water company plans to use ultra-high pressure to accelerate the delivery of purified water.

The plan is to build two water pipelines, but only one can be built at the moment, and the location has already been reserved.

Around 1 p. m., the convoy from Weifang Machinery Factory finally delivered the last batch of equipment to the construction site.

Zhao Xiaojun and Meng Jianye observed the construction team's operations.

Unlike underground water pipelines, surface pipelines have such large diameters that if they were manufactured in advance and transported by road, the transportation efficiency would be too low.

Therefore, Snail Industry has specially designed a technology solution for on-the-spot manufacturing.

A specially designed engineering vehicle was seen using a crane to insert two thin low-carbon steel plates into the vehicle's cylindrical pressing machine. In less than five minutes, the thin low-carbon steel plates were pressed into a cylindrical tube.

A technician from Snail Industry entered the interior of the pressed cylinder, where there was a row of holes—the place to put the screws.

Insert screws into the holes, press down the mounting bracket, press a switch, and then a row of pneumatic wrenches for screwing in screws and nuts is installed on the bottom of the outer side of the pipe.

After a loud bang, a row of screws at the bottom were locked in place.

Turn it another full circle and screw it in on the other side of the connector as well.

Then another specially designed engineering vehicle was connected end-to-end with the pressing machine, and a 10-meter-long low-carbon steel pipe was pushed from the pressing machine.

This specially designed engineering vehicle is specifically for electroplating pipes.

The technician quickly wrapped the pipe with a silicone film sleeve at both ends. This is specifically for parts that do not require electroplating. A portion must be left at both ends of the pipe as a splicing interface.

Soon, this section of pipe completed the electroplating process, transforming into an exceptionally robust silicon nanosteel pipe.

The pipe was lowered onto the first base by the crane and slowly lowered down. Construction workers used steel cables to secure the pipe. In fact, there was a groove on the base itself to ensure that the pipe would not shift.

This is the first section of the pipeline. The second section is a suspended pipeline, and the construction is different.

After receiving the steel pipe, the electroplating tank of the electroplating vehicle moves to the area below where the pipe is to be laid. Then, the entire electroplating tank is lifted upwards, and the semi-finished pipe is forced into the interface position of the first section.

Inside the first section of the pipeline, several construction workers moved a mobile pipeline sealing machine to the pipeline joint to ensure that the pipeline did not leak electroplating solution.

The electroplating chamber, which was soon wrapped around the second section of the pipe, started the electroplating process, which took about 120 seconds to complete.

The electroplating solution was pumped away, and the electroplating truck slowly drove forward, pulling out the processed pipe. Another specially designed engineering vehicle followed closely behind. This was a temporary support vehicle specifically designed to support such suspended pipes.

Following the same method, a 10-meter section of pipe can be laid approximately every 20 minutes.

Moreover, this laying technology allows for simultaneous installation of multiple sections. Even if there are discrepancies at the interfaces between two sections, they can be adjusted through pipes to achieve a seamless connection.

The equipment currently on the construction site can support simultaneous work at two locations.

A construction team can lay 240 meters of pipe in one shift.

With a few more construction teams and these equipment, laying one or two kilometers a day shouldn't be a big problem.

More than three hours later, the two construction teams completed the laying of about 180 meters of pipeline. The more than 70 meters of suspended length between the two bases did not affect the pipeline.

These laid pipes are still semi-finished products; they need to be completed in the final step to become complete finished products.

The final step is to add a vacuum layer. The glass used for the vacuum layer is pre-processed silicon nano-thin glass, which is then attached piece by piece to the surface of the pipe and secured with steel straps.

These glass vacuum sheets will be completely bonded together through a second electroplating process to form a vacuum insulation layer, ensuring that the pipes will not freeze due to low temperatures in winter.

Because many components are produced and sold in-house, the overall cost of a three-meter inner diameter water pipeline is approximately 2.74 million yuan per kilometer.

This cost is already relatively low. According to the planned route from Dongying to Linqing, the total length is approximately 312 kilometers.

The Shandong Province government provides a subsidy of 2 million yuan per kilometer and also covers land acquisition compensation, Blue Era only needs to spend 740,000 yuan per kilometer.

Including the booster stations along the route, the budget for this water pipeline is approximately 500 million yuan.

With no problems in pipeline laying, Zhao Xiaojun, Meng Jianye, and others went to the desalination plant at the Yellow River in Dongying to have the engineering team mobilized to expedite the second and third phases of the project.

It is expected that within the next six months, the annual output of the desalination plant will be increased from the previous maximum of 180 million cubic meters to the maximum of 1.2 billion cubic meters.

End of Chapter
PrevPreviousNext
NovelSummaries

Comments

No comments yet.
AboutStatsAPIChangelogStatusContactPrivacyTermsDMCA
© 2026 RandomTranslator·v3.27·RSS