Resumption of Updates Expected Mid-March, and Reasons for Recent Hiatus
My mother had surgery at the end of last year, and I went back to take care of her.
However, not long after my mother was discharged from the hospital and I had only been cooking and taking care of her for a few days, both of us got pregnant. That period was truly agonizing. After getting pregnant, my back pain worsened several times over, and I lost my appetite. Even after my fever subsided, I still had a persistent fever for two or three weeks. During those two or three weeks, it was so hot that I had to cover myself with a summer blanket even in the dead of winter, and I felt incredibly uncomfortable. I couldn't sleep well at all. Even in this state, I still had to insist on cooking for my mother every day and preparing nutritious meals. During that time, I didn't like to eat and just drank water in large gulps every day. I lost 10 pounds in two or three weeks.
During that period, I was so exhausted that I experienced heart pressure pain, palpitations, and difficulty breathing.
Finally, my mom felt a little better and was able to cook some simple meals for herself, and my heart condition also improved slightly, and I didn't feel so bad anymore. By then, it was almost the 20th of the twelfth lunar month.
Because three of my blood relatives have passed away in the past few years, it's been just my mom and me celebrating the Lunar New Year for the past few years. Just when we were feeling a little better, we had to get busy with the New Year preparations again.
My mom can't leave the house, so I have to do everything for her.
I was busy from the 19th of the twelfth lunar month until the afternoon of New Year's Eve; I was incredibly busy.
But before I knew it, it was already the Lunar New Year again, and I had to visit relatives and friends. (Heartbreaking)
In recent years, due to the pandemic and the need to avoid visiting relatives during the Lunar New Year, I haven't been able to properly visit relatives during the New Year for three or four years.
Goodness, I was busy until the eleventh or twelfth day of the first lunar month.
Fortunately, I took advantage of the time while visiting relatives during the Lunar New Year to carefully read through the previous 284 chapters, noting down all the details and foreshadowing. I wrote about 30 pages on both sides of an A4 sheet, a thick little stack. With this, any future writing will be able to avoid conflicts with the previous text.
Do you guys remember when I said I was planning to start a side hustle?
Last September or October, I started preparing. I borrowed an electric pickaxe and dismantled the heated kang bed in the bedroom of my old house, planning to renovate it properly and open a physical store to earn some money to support myself. The money I, a nobody, earn from writing novels is simply not enough to support myself.
As it turns out, accidents always happen so suddenly.
There was a sudden outbreak of COVID-19 in my village, and it was locked down. When I found out the village was locked down, the traditional heated brick bed (kang) had just been dismantled, and they were just waiting to find someone to collect the construction waste.
I was dumbfounded.
The garbage couldn't be thrown out, and the floor inside the house was covered with dust that smelled of coal tar and had escaped from the dismantled kang (heated brick bed).
The smell of smoke made my heart ache terribly, but there was so much construction waste that I couldn't get rid of the smell. I also have a bit of OCD and I'm a bit of a germaphobe. I was really desperate those few days.
Fortunately, the lockdown was lifted after only a few days.
After I let go of the burden, my mother suddenly decided to have surgery. So I left the mess of dismantling the heated brick bed and dealing with my mother's situation first.
When I return, it will be around the 20th of the twelfth lunar month.
During the busy New Year period, just cleaning up the dust from the demolished kang (heated brick bed) kept me extremely busy.
I already had lower back pain, and after the sheep incident, I felt even weaker, so I was really exhausted.
After finally getting a break on the afternoon of New Year's Eve, the non-stop, high-intensity New Year's greetings and visits began again on the first day of the Lunar New Year.
After finishing up and resting for less than two days, I went back to the old house to continue the various tasks that had been done since the kang (heated brick bed) was dismantled last year.
I originally planned to expedite the construction before the Lunar New Year and open for business immediately after the holiday.
Construction didn't resume until the 13th day of the first lunar month.
To save money, my cousin and I did all the manual labor and odd jobs that didn't require any skills.
Starting with demolishing the old, dilapidated toilets, and then finding a bricklayer to repair the various potholes and uneven surfaces that had accumulated over a decade in the old house, I followed the bricklayer around as a laborer, handling cement, moving things, and I was so exhausted that I questioned the meaning of life.
After the sheep were released, I really couldn't do any physical labor. My physical strength dropped so much that I was so tired that I felt anxious.
The bricklayer's work was temporarily finished, and my cousin helped me dismantle the partition wall inside the 30-year-old tile-roofed house, as well as the rotten wooden doors and windows that had been used for over 30 years... Adding the construction debris from the small toilet, it must have weighed at least five or six tons in total. I hired a truck that collects construction waste, but they wouldn't even let me load it onto the truck. Luckily, my two cousins were there to help me that day, otherwise I would have been dead. Even so, my back still feels like it's broken.
Later, when we hired another bricklayer, I continued to work as a laborer, and in my spare time I also had to remove the old plaster from the walls and clean the areas for the plastering beforehand.
After that, my cousin helped me renovate the old tile-roofed house with a completely new electrical system, and replaced the old, broken, and somewhat thin main cable that led into the house.
Then there's the constant stream of things to do: finding a carpenter to repair the ceiling, replacing the drainpipes, and making the cheapest aluminum alloy doors and windows...
This year's late spring cold snap was particularly severe, and the brand new concrete floor that should have been laid much earlier has yet to be installed.
The bricklayer said that it was too cold and the concrete would freeze into something like tofu dregs.
All I can do is wait and wait.
Other work, including the last few aluminum alloy doors and windows, floor paint, exterior wall paint, and plastering of the tiled roof, can only continue after all the floor work is completed.
As a result, it's dragged on until today, and not a single major task is 100% complete. It's driving this perfectionist crazy.
Fortunately, I have other jobs to do, such as the electrical work I did a few days ago, and the waterproofing work I did today on the old tile-roofed house, where I applied waterproof paint myself.
It didn't delay the construction schedule too much.
But the more work I do, the more work there seems to be, and there's still a ton of work left to do.
Something infuriating happened this afternoon. I was applying waterproofing paint when I suddenly realized it was raining outside. There were 30 bags of cement I'd brought in outside, for paving the floor the day after tomorrow. Cement gets ruined when it gets wet, so to save money and not waste materials, I hauled all 30 bags—a ton and a half of cement—into the house. And then, the hell, after I finished, the rain stopped! It's ridiculous!
However, doing it myself also has its advantages. Starting from the 13th day of the first lunar month, with my own time and energy, plus my brother's help, I saved nearly 10,000 yuan.
I really put in a lot of effort and time to make the renovation and refurbishment more cost-effective.
However, it's worth it.
By personally participating in the supervision, not only are the results better, but it also saves money. Haha.
Tonight, I worked overtime to finish waterproofing part of the old tile-roofed house. During a break to drink water, I realized that February was already over, and I hadn't updated a single chapter. So I'm rushing to tell you all about my recent situation.
I spent over an hour typing this on my phone. It's been a long time since I've typed. I really miss the feeling of writing. Before I knew it, I'd written over two thousand words. Hehe.
As things stand at the moment.
The weather has warmed up recently, so we can finally start excavating. Once the ground is cleared, the other tasks will be completed soon.
Once all the workers have left, it will conservatively take at least half a week just to clean up. So it should be finished around mid-March.
After everything was set up, my fitness studio opened. If customers came, I made money; if not, I could sit in the shop and write novels. The two jobs didn't interfere with each other.
I've been frequently updating my renovation progress in the book club group lately. If you'd like to supervise, you can join the QQ group: 666277875
Damn, I was almost finished writing when I suddenly remembered I had half a bucket of waterproof paint left to dry outside...
Damn it, it's solidified into a paste and unusable. I've lost tens of dollars.
Wipe.
I should use that bit of time to type more ಥಥ Damn it