Ch. 581Valyrian steel
Redd directed the reconstruction of Valyria City and the conversion of its Underground Fortress into an Underground Dragonpit, using Demon Dragons to speed up the excavation. The work uncovered vast deposits of Valyrian steel and other ores, leaving Redd with a valuable local supply for the city’s rebuilding.
- Redd stationed soldiers and Demon Dragons at the thunderstorm gaps to control access to Valyria City and oversaw its reconstruction along the original foundations.
- Redd put Demon Dragons to work excavating and modifying the Underground Fortress, using their strength and Dragonfire to move, cut, and break rock.
- Douglas brought Redd intelligence while Redd directed the Demon Dragons, whose construction work cut the Underground Dragonpit project’s expected duration by at least half.
- The Demon Dragons uncovered veins of Valyrian steel and other ores while excavating beneath Valyria.
- Redd ordered Douglas to sort and store the ores, keeping the Valyrian steel separate and allocating the rest to supply reserves.