January 3, 2028.
Just after New Year's Day, with the cold wave subsiding, a blimp sailed south along the Southern Jiangxi River under the clear blue sky over southern Jiangxi.
The Airport New Area near Xihua Township.
On the construction site, the sky suddenly darkened.
"Huh?" Lao Zhou, a construction worker who was tying steel bars, subconsciously looked up, then froze, "... What is that?"
"An airship!" Old Huang, a fellow worker next door who was also tying steel bars, stood up and stretched his stiff back and legs. "Phew... this thing is fucking huge."
Under the watchful eyes of a group of construction workers.
Airship No. 3001 slowly docked nearby and unloaded 2,700 tons of steel bars in an open area.
The project manager of the construction company who contracted the site, looking at all these steel bars, finally realized that half a month ago, Hai Lu Feng Company had asked them to report the amount of steel bars they used, and then asked them to transport the ordered goods to Hukou County.
"Manager Zhang, how much does the Hai Lu Feng Company charge us for hauling 2,700 tons of steel bars at once?" another manager in the project department asked curiously.
Zhang Hongchang glanced at the transportation fee invoice on his phone. "257,580".
"257,580? This cost..." The manager estimated in his mind. "About that. If it were transported by river, it would also cost over 200,000, but this is much faster than river transport."
"Of course, boats have to go upstream on the river and pass through several locks. Airships fly directly in the sky. And airships have another advantage: they can go directly to the construction site without having to be brought over from the dock." Zhang Hongchang looked at all the steel bars; they would last them for several months.
Actually, he made a mistake in one thing.
Although the airship could fly directly to the construction site, it was because the site was very large and the cargo consisted only of steel bars, without any other miscellaneous items.
If it is a regular general cargo container, it must be unloaded at a dedicated airport and then transported by truck to the user.
In fact, of the four Blue Whale Type 1 Airship that Blue Whale Airship Company has been producing, three are used for ordinary container transportation, while the fourth is used for special transportation, specializing in the transportation of large items.
Similar to the blades of giant wind turbines, which are now often hundreds of meters long, offshore wind power projects are somewhat better off as they can be transported by cargo ships. However, for Lu Di wind power projects or factories located in Lu Di, the transportation process is extremely troublesome.
Not only are the transportation costs very high, but escort vehicles, tanker trucks, and safety officers are also required. Transportation applications must be submitted a month in advance, and routes need to be surveyed and planned in advance.
By contacting the Special Transportation Division of Blue Whale Airship Company, the cost can be reduced by about half.
Of course, it is not cost-effective to transport a single large item. Generally, it is better to gather 200 tons of goods at once and transport them by air. This can save about 65% of the overall cost.
Therefore, after Blue Whale Airship Company launched its special transportation service, it was immediately contracted out to Power Construction Group.
The power construction group, which is building the Medog Hydropower Station, needs to transport large equipment to MT County. However, the Medog Highway has limited carrying capacity, especially the presence of tunnels, which restricts the passage of many pieces of equipment and parts.
Unexpectedly, the airships of Blue Whale Airship Company have such a large payload. After cooperating with Blue Whale Airship Company to try to transport a large set of equipment directly from western Western Yunnan across the Hengduan Mountains by airship to the construction site, they were unstoppable.
These days, the Blue Whale No. 1004 Airship is stationed in Western Yunnan, constantly transporting large equipment and materials to the Medog Hydropower Station.
Compared to road transport that traverses mountains and valleys, airship transport reduces transportation costs by nearly 80% and is also highly efficient.
Airship No. 1004 can make one trip a day. If there were enough cargo to carry on the return trip, Power Construction Corporation could save on return vacancy fees.
Power Construction Corporation of China has built several centralized Warehouse Center for steel bars, cement, and equipment in Southwest China, and then uses airships to continuously transport these raw materials there.
It's not just the Medog Hydropower Station that needs this special kind of transport; other hydropower stations and infrastructure projects in the Snowy Plateau can also use airships.
Therefore, the airships currently being built by Blue Whale Airship Company are intended for use in special transportation.
Conventional transportation can actually be slower because the airport's supporting facilities are not yet fully developed.
Specialized transport does not require airports because it often needs to go directly to its destination and cannot be loaded or unloaded at an airport.
Although the airship cannot be fully loaded during the crossing of the Hengduan Mountains, and can only transport up to about 150 tons, it is already very capable of transporting 150 tons at a time, which is already difficult in the Hengduan Mountains and the Snowy Plateau.
Moreover, Blue Whale Airship Company is already building the Blue Whale Type 2 with a payload of 500 tons, and has already conducted trial runs of the Blue Whale Type 3 with a payload of 2,700 tons.
Therefore, Power Construction Corporation no longer has to worry about the transportation of equipment and raw materials.
Other companies that were a step behind are also urging Blue Whale Airship Company to quickly build airships, as many domestic companies need this mode of transportation that is not limited by road dimensions.
It's not just large hydropower station construction companies that need it; mining companies that extract minerals in remote areas, large equipment in specialized factories, wind power projects, and large bridge construction all require this type of transport airship.
Therefore, even though not many airships have been built, Blue Whale Airship Company has already received more than 300 special transport orders.
These special transport orders alone are worth over a billion yuan.
After unloading the steel bars, the Blue Whale No. 3001 flew towards the watershed between the Ganjiang and Beijiang rivers, namely Dayu Mountain Range.
Dayu County.
Construction is also in full swing near the county seat because there is a special hub airport there.
In fact, the nearby Dayu Mountain Range Hub Station is under planning and construction, which is currently the last water transport hub station on the Yue-Gan Canal.
Because this hub station is not yet completed, inland waterway transport vessels can only stop near Dayu County, but cannot directly travel to the upper reaches of the Beijiang Pearl River System.
However, this situation will be changed today.
Two days ago, Experimental Ship No. 1 arrived at the Dayu County Airport construction site, carrying 2,390 tons of steel bars. After unloading the steel bars, Experimental Ship No. 1 was loaded into specially secured containers and quietly awaited the arrival of the airship.
After the airship arrived.
Experimental Ship No. 1 once again sailed upstream, bringing the ship very close to the watershed. From here, the construction site of the Dayu Mountain Range Hub Station workers were working overtime, could be seen not far away.
Amidst the astonished gazes of the construction workers at the Dayu Mountain Range Hub Station
Blue Whale No. 3001 was secured to Experimental Ship No. 1 and slowly ascended into the air, carrying a weight of 2,750 tons.
When the altitude was high enough to safely cross the Dayu Mountain Range, the airship flew over effortlessly. Half an hour later, the airship lowered Experimental Ship No. 1 onto a calm and open body of water in the upper reaches of the Beijiang River.
"A ship flew over?" The driver and owner of a nearby transport ship carrying building materials stared in disbelief at the scene before him.
"Brother, what's flying over here?" Another young man walked up from behind, and he was also stunned, exclaiming in disbelief, "Damn! An airship is coming from the north of the Dayu Mountain Range?"
To the astonishment of the two brothers.
Experimental Ship No. 1, carrying 73 containers, slowly drove past their ship.
After glancing at the draft of Experimental Ship No. 1, the two brothers knew that the ship was fully loaded for transport.