Director Miao left, looking worried and even slightly regretful before he left.
One can imagine his feelings. Logically speaking, designing a Road Network for a development zone should take at most a week, but Song He's tone was even more extreme, compressing it to the hour!
This is utterly ridiculous! So unreliable!
It's getting late; I reckon Director Miao won't be able to sleep after he gets back.
Song He sat back in his boss's chair and spread out sheets of data on the table.
There's a lot of data related to the High-tech Development Zone, over two hundred pages, equivalent to exam papers for several classes. It would take a normal person a whole day just to look at it, and they might not even be able to remember it.
Song He remained completely calm, his eyes transforming into scanning machines as he rapidly scanned each document, thoroughly absorbing all the data!
Turn on your computer and get to work!
Instead of designing the roads directly for the development zone, he considered the entire Lvteng City as a whole.
No part of a city exists in isolation!
The employees work in the development zone during the day and go back to the old town to sleep at night. The traffic during the morning and evening rush hours must be taken into account!
Some raw materials require long-distance transportation, and the distance between large trucks and highways must be taken into account!
The second phase of the development zone is right next door, so the relationship between the first and second phases must be taken into account!
We even need to consider the most extreme scenarios.
The High-tech Development Zone in Lvteng City is actually an industrial zone that manufactures high-end products.
Industrial zones inevitably carry accident risks. In the event of a fire or explosion, will the surrounding factories be affected? Will fire trucks be able to get in time?
If a chemical product leaks, will the frantic evacuation of people cause traffic jams?
There are too many factors to consider, and every single one of them must be taken into account!
With his hands on the keyboard, Song He focused intently on the calculations, gradually drawing out the complex and confusing mathematical model, outlining the entire city's shape.
As the calculations continued, he broke out in a sweat again, clearly indicating that the high-intensity work had taken a toll on his physical strength!
[Mathematics Progress detected; Platinum level upgraded from 82 to 83!]
Perhaps because it was the first time designing a road from scratch, the system also gave us an upgrade.
Outside the window, night is deepening!
Time flew by, and two hours passed.
Song He finally completed the mathematical model, opened the professional drawing software, and generated the main road of the High-tech Development Zone!
On the blank land, Road Network spread out like leaf veins, as if the entire land was slowly nurturing a giant life!
Song He took the initiative and worked on it. The thick veins of the leaf extended to both ends and branched out into countless small branches. At first glance, they looked like tiny cracks formed by striking the ice surface, but at the same time, they were quite regular, with straight lines horizontally and vertically!
Numerous auxiliary roads and side streets have been drawn, spreading across the entire development zone like capillaries!
With the basic framework complete, the next step is to refine and polish it!
Song He calmed down and began to delete small paths one by one, or make slight adjustments, just like a jeweler cutting a diamond, ensuring that the angle of each edge is accurate!
Three hours later, the city's Road Network was finally completed!
Song He opened the City Road Network Generator and enabled the self-editing mode.
This mode can import road network maps from external sources to test congestion rates.
He put in the completed city map and started testing!
The computer fan was spinning wildly, emitting a desperate roar!
Song He felt a little guilty. His computer was even worse off than the donkey in the production team. It did heavy work every day and processed extremely complex data day and night. It was even more hard-working than the computer that was reincarnated into the hands of a gamer. Perhaps only a mining machine could compare to it in terms of suffering.
After a full ten minutes of waiting, the computer got so hot it almost spontaneously combusted.
Finally, the data appeared!
Overall Congestion Rate: 14%–18%!
When a road network map is imported from outside, the program can only generate a rough range, which is not as accurate as a road network generated by itself.
Having defined the area, Song He continued to revise it, deleting half of the main road and replacing it with a large area of smaller roads.
Hmm... it looks much simpler now, that's how it should have been changed!
Test again!
Overall Congestion Rate: 11%–14%!
Still a bit too high, Song He pondered for a long time and then made some straight roads more curved.
The road network in the development zone has become more rounded, with all the curves bending, as if the hard roads have been slightly deformed under the scorching heat.
It may seem like a simple curve, but it's backed by a lot of calculations. Curves can change the speed of traffic and the total length of transport routes. Although the changes are subtle, they add up and, when scaled up over the entire city, the effect should be quite significant!
Test again!
Overall Congestion Rate: 6%–9%!
"Smack!"
Song He slapped his thigh with joy, "I can report back now!"
However, he was still not satisfied.
He wanted to "create" some area!
Save some land occupied by roads and use the extra land to build a new factory for Chenghuang Company!
After working so hard, how can we not seek benefits for our own company?
The current design plan is based on giving Chenghuang twice the land area, but is there any possibility of expanding it to three times the land area?
I checked the time; it was 1:30 a. m.
Exhausted, Song He forced himself to stay awake, first saving the current plan, then making a copy, and persistently revising it!
In the quiet, bright office, the monotonous clicking of the mouse and keyboard echoed, as if counting down the time.
Two long hours passed.
Song He was sweating profusely from exhaustion, nearly collapsed, and his strength was almost completely depleted!
He slammed the Enter key, and the computer fan spun wildly again. He leaned back and slumped in his seat, waiting, clearly testing the Overall Congestion Rate again.
Ten minutes later, the computer fan slowed down!
Song He's eyes lit up suddenly, and his face lit up with joy!
He picked up his phone and called Mayor Li directly.
After a long wait, the call was finally connected.
"I'm so sorry, Mayor, for waking you up so late. I have something important to ask you!" Song He apologized first, since it was the middle of the night.
Mayor Li was clearly dazed, and after a moment of hesitation, he weakly said, "It's nothing, it's nothing, you go on..."
[Mayor Li was woken up by you in the middle of the night and almost had a heart attack. He just took some Heart-Saving Pill. Resentment Value +700!]
"I've just finished designing the roads for the High-tech Development Zone, and now I have two options!" Song He said. "I'd like you to choose one!"
"Finished?" Mayor Li's voice instantly brightened, his tone incredulous. "Two sets too?"