Before long, the water level in the river more than 200 meters away began to rise and flowed rapidly downstream.
After the test was completed without any problems, Ye Changcheng immediately notified the staff at the Hekou Station to close the water supply gates. It was not time to supply water yet; they had to wait until the water distribution and pressurization facilities at the Guhua Station were completed before they could officially supply purified water to the Guhua District.
Beside the planning map, Ye Changcheng addressed the group:
"By the end of the month, the Dongying North Line will extend to the Shanghe and Linyi County areas. If all goes well, we can lay the remaining 260 kilometers of pipeline to the canal in Linqing City in about three months."
Li Xingguo from Hebei Province estimated, "It's early May now, and in three months it will be early August. It seems we need to prepare early."
"Indeed, I suggest that the areas along the South Canal prepare to open the sluice gates and release water, and also make good use of the existing irrigation ditches." Zhao Xiaojun shared the same opinion.
Blue Era Hebei Province is taking over and reorganizing its local water resources, the province must make relevant plans as soon as possible to avoid a situation where the water arrives but the cities and farmlands along the river are not prepared.
Of course, this requires the active cooperation of the local authorities.
In fact, both Hebei Province and Henan Province are very supportive of the Blue Era plan, even more so than the South-to-North Water Diversion Project, which has been in the planning stage for some time.
The reason for this is that once the water pipelines of the Blue Era were built, the water pressure could be increased to increase the water delivery volume.
Currently, the water flow velocity in the pipeline is around 8.3 to 8.6 meters per second. For a water transmission pipeline with a diameter of 3 meters, the flow rate at this velocity is 93,000 to 96,000 cubic meters per hour, which translates to approximately 810 million cubic meters of water transported per year.
For every 0.1 m/s increase in the water flow velocity, the annual water delivery volume increases by approximately 10 million cubic meters.
The limit for silicon nanoparticles is that they can withstand water flow speeds of approximately 40-50 meters per second. From an economic perspective, a flow speed of 20-25 meters per second offers the best cost-effectiveness.
In other words, within the range of optimal cost-effectiveness, a single-line water pipeline can transport 2.4 to 2.6 billion cubic meters of water annually.
If cost-effectiveness is not a factor, increasing the water flow speed to 40 meters per second would allow for the transfer of approximately 4 billion cubic meters of water annually.
Keep in mind that this is just a single line; there will be second and third lines in the future.
The eastern and central routes of the South-to-North Water Diversion Project are planned to transfer only about 4.4 billion cubic meters of water per year.
In fact, Beijing Enterprises Water Group has already contracted the tap water supply for Beiping and Tianjin, and plans to build a seawater desalination plant along the coast of Tianjin to completely solve the water problem in both places.
Therefore, the strategic importance of the eastern route of the South-to-North Water Diversion Project has declined sharply, and the central and western routes are currently being considered, which still have some strategic significance.
After inspecting the Dongying North Line, the parties discussed the next steps for the water pipeline project, including the Dongying North Line currently under construction, as well as its extensions, namely Linqing - South Canal and Linqing - Handan - Xingtai.
There are also plans to build the Cangzhou Line, extending it to northern Hengshui, Shimen, Baoding, Langfang, and Zhangjiakou.
The Qinhuangdao Line extends towards Tangshan and Chengde.
The Rizhao Line, on the other hand, passes through Weishan Lake and enters the inland Henan Province.
Each province provides subsidies for these water pipelines, with a price of two million yuan per kilometer. Land acquisition is also the responsibility of each province.
In order to speed up the laying process, Hebei Province and Henan Province even pledged to build pipeline foundations.
Zhao Xiaojun did not refuse. In any case, the pipeline foundation did not involve any technical content. As long as the indicators met the requirements of the Blue Era, he would let the local areas prepare it themselves.
According to the preliminary design, this water transfer project consists of four lines, with a construction speed of 100-150 kilometers per month extending inland.
The entire trunk line is expected to be laid by 2012.
This will result in the following water transfer systems: Qinhuangdao Line (dual-pipeline) with an annual water transfer capacity of 4-4.5 billion cubic meters; Cangzhou Line (five-pipeline) with an annual water transfer capacity of 10-12 billion cubic meters; Dongying Line (five-pipeline) with an annual water transfer capacity of 10-12 billion cubic meters; Rizhao Line (eight-pipeline) with an annual water transfer capacity of 16-20 billion cubic meters.
The total water transfer volume is 40-50 billion cubic meters per year.
In addition to domestic, commercial, agricultural, and industrial water use, the government has also allocated a portion of this large amount of purified water, approximately 4 to 5 billion cubic meters per year, for ecological replenishment. This water is re-injected deep underground to prevent the North China Plain from sinking further.
The price of ecological replenishment water is 0.35 yuan per cubic meter.
In reality, Blue Era didn't make much money. As the water transport distance extended, the transportation cost increased by an average of 0.01 yuan for every ten kilometers, and 0.1 yuan for every hundred kilometers.
For example, the water pipeline from Cangzhou to Shimen is about 360 kilometers long, and the cost of water transportation alone is 0.36 yuan.
Including water purification costs, equipment depreciation, and personnel expenses, the total cost is approximately 0.16 to 0.18 yuan per cubic meter.
Therefore, ecological water replenishment earns an average of 0.12 to 0.14 yuan per cubic meter within 50 kilometers of the coast; 0.07 to 0.09 yuan per cubic meter within 50 to 100 kilometers; and basically operates at a loss beyond 200 kilometers.
The money lost in this part can only be subsidized by the government. Anyway, once the groundwater recovers to its previous state, ecological replenishment water will no longer be needed.
To reduce some costs, Blue Era plans to install a hydroelectric generator at the outlet of the water distribution station to power the relay pressurization system.
The reason for this design is that high-speed flowing water needs to be depressurized at the water outlet. The flow rate at the user's outlet is usually between 0.6 and 1.2 meters per second. If the flow rate is too fast, it may harm the body. Just look at high-pressure water guns and high-pressure water jets to understand this.
Instead of letting the kinetic energy of this water go to waste, it would be better to use it for hydroelectric power generation, which would then be supplied to the repressurization system of the water distribution station.
After the relevant contracts were signed, the announcement of this cooperation instantly sparked heated discussions in China, and even drew attention to the contract abroad.
After all, the annual desalination of 40 to 50 billion cubic meters of seawater and its supply to inland areas is indeed very attractive to countries with coastal areas but lacking freshwater resources.
In particular, the large dog owners in West Asia own many seawater desalination plants, although their technology is not as advanced as that of the Suiren Company.
However, their oil is very cheap, and they can use oil and natural gas to generate electricity, reducing the cost of seawater desalination and barely ensuring their own water needs. As for things like growing food, that's out of the question.
As for developed countries, although they pay attention to this technology, they do not have an urgent need for it.
Various parties have sent numerous inspection teams to China to study Blue Era's seawater desalination plants, but their purposes differ.
The big players in the dog industry want to buy seawater desalination equipment, while developed countries like Australia and Mediterranean countries want to acquire the technology, or even invest in or acquire Blue Era.
As the world's leading USA, the United States' CIA Asia-Pacific Division has also been actively involved, paying increasing attention to the rapidly rising technology company, Suiren Company.
However, the protection provided by China is very strong, and the Security Department within Suiren Company is also on high alert.
The company's scientists, technicians, and executives are all under strict protection, and even their families are included in the protection efforts.
It even stipulates that researchers are strictly prohibited from going abroad or traveling alone, and should minimize their air travel. If they must travel by air, they should not concentrate on one or two planes.
Just like Huang Xiuyuan north to Shandong Province, he took the high-speed rail.
Thank you all for your support, and thank you to the readers "Where Lies My Path", "Create Sandbox World", "Wandering Alone for Ten Thousand Years", "Empty Sky", "I Walk Alone Through the Mortal World 3687", "Such a Cute Boy QAQ", "Qingtianyi", "Bu De Liao Liao", "Dream Ant", and "Great Wisdom Like the Universe" for their generous donations (ω`).