February 28, 2010.
Lantern Festival.
Ning District, Weizhou Town, in the central part of Wuzhong City.
Near the provincial highway is the Weizhou Coal Gangue Power Plant, which was invested in by Huaneng Group in 2007. The power plant has recently entered the trial operation stage.
Wang Shuo, the vice president of Huaneng, arrived at the Weizhou Coal Gangue Power Plant on the eighth day after the Spring Festival. His urgency and concern were mainly due to the fact that this power plant is very important and is related to Huaneng Group's industrial upgrading strategy.
At his urging, Chang Fuguo was unable to come to Ning District due to dealing with various car companies recently, so Du Jinhua had to come instead.
Du Jinhua, who brought a large amount of equipment, arrived at the Weizhou Coal Gangue Power Plant on the Lantern Festival.
The plant area is clearly divided into two large areas: the power plant area and the gas refining plant area.
Du Jinhua led the convoy into the interior of the gas refinery.
Wang Shuo, who had been waiting for a long time, immediately came forward to greet Du Jinhua as he got out of the car, "President Du, it's been a long time."
Du Jinhua pointed to the convoy and said, "Mr. Wang, I've brought all the equipment. We can start installation and testing now."
"Then let's not delay. The factory's internal infrastructure is ready, and the workshops have been set up according to your design drawings."
Entering the factory premises.
The engineers and technicians from Snail Industry began to deploy the equipment according to the planned design scheme. Snail Industry itself was involved in the design work, and with the cooperation of the engineering team from Huaneng Group, the installation of the equipment was very fast.
Snail Industry's equipment is modularly designed, and with complete infrastructure and supporting facilities, the equipment can be installed in less than four days.
The gas refinery has completed the equipment installation and is now entering the commissioning phase.
Meanwhile, Du Jinhua, along with a group of engineers, began installing thermoelectric generator modules. The gas turbine generator sets at the Weizhou Coal Gangue Power Plant used gas turbines from General Electric, a choice made out of necessity.
However, the newly renovated power plants have already planned to use the North Wind Gas Turbine. Now that the performance of the North Wind Gas Turbine has caught up, the Five Major Power Generation Groups will naturally take care of their own "son".
These gas turbines from General Electric have a thermal efficiency of around 58% during cycle combustion. After installing a thermoelectric power generation system, the overall thermal efficiency will increase by another 10%, reaching an astonishing 68%.
It took 12 days in total to finally complete the new energy transformation of the Weizhou Coal Gangue Power Plant.
Central control room.
Du Jinhua pushed open the door and entered. "President Wang, all the equipment has been re-inspected and can begin trial operation."
"Thank you for your hard work, Mr. Du." Wang Shuo immediately ordered the trial run and testing to begin.
At the two main plant areas of the Weizhou Coal Gangue Power Plant, as trial operation testing began, truckloads of coal gangue and washed coal were poured into the crusher. After initial crushing by the crusher, the coal gangue and washed coal were turned into coarse particles.
These finger-sized mixed coarse particles are conveyed into the gasification workshop. A large amount of N16 Catalyst solution is sprayed onto the mixed particles. With the assistance of water temperature and ultraviolet light, the organic matter in the mixed coarse particles is quickly converted into methane and propane gases.
The mixed gas flows through gas pipelines to the power plant area, enters the gas turbine, and soon the power plant's output electricity skyrockets.
A gas turbine generator set with a rated power of 300 megawatts can generate an output power of 351 megawatts when operating at full power.
Compared to ordinary coal-fired power generation units, which have an efficiency of only 40% for the same calorific value, the thermal efficiency of the gas turbine combined with the temperature difference has reached 68%.
Improved thermal efficiency allows for greater utilization of the same fuel, reducing pollution emissions and increasing power generation, which in turn lowers power generation costs for power companies.
After running for about two days, the engineers found all the minor problems with the system and then shut it down for improvements.
Within the factory premises.
The electricity generated during the two-day trial run was not wasted; it was used entirely for refining elements, methane, and propane. Waste is shameful.
The excess methane and propane were stored in a reserve area 2.3 kilometers away from the plant, specifically for emergency backup in case of raw material shortages.
In addition, the gas refinery also features a brand-new process developed by Suiren Company: carbon dioxide decarbonization technology.
Wang Shuo, Du Jinhua, and others, wearing gas helmets, watched as pure carbon powder was compressed into carbon bricks. This pure carbon powder was a product of carbon dioxide decarbonization technology.
"This technology is great; your Suiren Company's ideas are truly imaginative."
Du Jinhua smiled and said, "After all, energy doesn't disappear; it only transfers. We're just preserving it in the form of fixed carbon."
The engineers from Huaneng were full of admiration. As insiders in the power industry, they naturally knew many of the challenges facing the domestic power generation sector.
At present, the challenges facing China's power industry include losses from long-distance power transmission, which account for 6 to 10% of total power generation; another challenge is the uneven spatial and temporal distribution of electricity consumption.
In particular, wind and solar power, these "waste electricity" sources, are veritable power grid killers, greatly increasing the difficulty of power regulation.
The emergence of carbon dioxide decarbonization technology is to solve the problem of power regulation. During surplus periods, electricity is converted into fixed carbon. When the demand for electricity reaches its peak, the fixed carbon is mixed with water and refined into water gas, which is then sent to gas-fired power plants.
In this model, the energy generated by wind and solar power can be fixed, achieving long-term storage and readily available access.
Carbon dioxide decarbonization workshop.
Several engineers are trying to fix a few minor issues.
This technology is another major application of Hexa-conical Spherical Oxygen.
The decarbonization workshop extracts carbon dioxide from the atmosphere, compresses and condenses it into liquefied carbon dioxide, and then injects it into Hexa-conical Spherical Oxygen for decarbonization. The refined products are pure carbon powder and pure oxygen.
The pure oxygen is not wasted, but is directly fed into the gas-fired power generation system to improve the complete combustion rate of the gas, and only the excess pure oxygen is released into the atmosphere.
"President Du, with your technology, we won't need to build energy storage reservoirs or anything like that. Moreover, it reduces carbon dioxide in the atmosphere, so those foreigners' carbon neutrality traps won't work on us." Wang Shuo said with a smile.
Due to the need for environmental protection and carbon neutrality, the thermal power industry, which accounts for the largest share of carbon dioxide emissions in China, is the first sector to be affected.
Especially after the signing of the Copenhagen Accord last December, China's environmental pressures have been increasing day by day.
This also accelerated the in-depth cooperation Five Major Power Generation Groups and Suiren Company.
Huaneng was the first power generation group to take the plunge.
The Weizhou Coal Gangue Power Plant model is not yet the final form, because the power plant does not yet have supporting photovoltaic or wind power plants. This waste-to-energy is a huge supplement to the gas refinery.
Huaneng Group's next step is to introduce composite solar panels from Snail Industry. Ning District is a region rich in solar energy, with an annual total solar radiation exceeding 1740 kWh/square meter.
With the successful trial operation of the Weizhou Coal Gangue Power Plant, the joint report from Snail Industry and Huaneng Group also reached the heads of the other four power generation groups, making them even more eager.
Thank you everyone for your support (ω`), and thank you to reader "Rekindling Broken Dreams" for the generous donation!
First update (˙ω˙)