Skip to main content
  • Home
  • Library
  • Read
    • Popular
    • Charts
    • Browse
    • Categories
    • Wikis
    • Glossary
  • Request
  • Activity
  • Leaderboard
  • Help
Our Apps
  • DaoSearch
  • Narratorr
Social
  • Discord
  • Patreon
Nano Rise
Chapter 203

Power Supply Problems

1,397 words 5 min read 0 views 4mo ago Source ​
Skip to the end of the chapter
Prev
Next

Wang Shuo had traveled from Weizhou Power Plant in Ning District to Dezhou Power Plant, washed his face after getting off the bus. Seeing his increasingly thinning hair, he was very worried about whether he would have any hair left on his head in a few years.

He patted his face, cheered himself up, and went into the meeting room.

Lin Yicai, the branch manager of Dragon Totem, Zhao Xiaojun, the Shandong Province branch manager of Blue Era, and other relevant company leaders were all in the meeting room.

The purpose of this meeting was to ensure a stable power supply in Dezhou. Although the Suiren Group has many self-sufficient generators, and with the recent solar power plant project under construction, the power supply can basically be maintained.

However, as Dezhou's industries have grown to scale, becoming the core of the semiconductor industry in the north and the core of China's solar energy industry, as well as one of the transfer stations for water from the east to the west, its electricity consumption has been increasing day by day.

Last year, Dezhou's industrial electricity consumption was only 2.6 billion kilowatt-hours, but by early June this year, in the first five months alone, industrial electricity consumption had reached 1.64 billion kilowatt-hours. It is estimated that the annual industrial electricity consumption will approach 4 billion kilowatt-hours.

Fortunately, a large portion of the industrial electricity used by the Suiren Group is self-sufficient thanks to its own generator sets; otherwise, the electricity consumption would have increased by at least 500 to 800 million kilowatt-hours.

Even so, the enormous pressure on power supply is still a major challenge for the power grid, which in turn puts that pressure on several power generation groups.

Wang Shuo reassured the heads of several companies with high electricity consumption:

"Rest assured, everyone. The three 350 MW gas turbine generator units from the Dezhou Power Plant arrived in Dezhou a week ago. Engineers from the North Wind Factory are currently installing and commissioning them, and they will be put into operation next month."

"That's good. My glass production line can't stop, otherwise the whole set of equipment will be useless."

"Old Zhao, stop complaining. My Monocrystalline Silicon furnace is different. Snail's glass factory is much better; it has its own generator set."

"Haha, you can't be envious. A single gas generator set costs several million. Your Monocrystalline Silicon solar panel factory probably needs five or six sets to keep up with demand."

"Unless you have your own gas supply, you should just give up on that idea!"

The CEOs and managers started discussing it.

After reviewing the second phase plan for the Dezhou Power Plant, Zhao Xiaojun put down the documents and then spoke with Wang Shuo and the person in charge of the power grid in Dezhou.

Based on the current situation, Dezhou's total electricity consumption is expected to grow at a rate of 20-30% per year over the next five years.

By 2015, annual electricity consumption will reach 15 to 16 billion kilowatt-hours, which is about three times the current annual electricity consumption in Dezhou.

Zhao Xiaojun cautioned, "Relying solely on the Dezhou Power Plant may not be enough to cope with future development."

Wang Shuo also gave a wry smile, scratching his thinning hair. "The North Wind-2 gas turbine has a power output of 350 megawatts. If it operates at full capacity year-round without interruption, it can only generate 3 billion kilowatt-hours of electricity."

However, in reality, the annual operating time of thermal power plant generator units in China is typically around 5,000 to 5,500 hours.

This is because of the need for peak shaving and valley filling, and the fact that power plants can generate electricity and connect to the grid is not something that can be done just like that. The pressure on the power grid and the electricity demand in the surrounding areas must also be considered.

Thermal power plants with an annual power generation capacity of over 6,000 hours are extremely rare in China.

The power grid manager stated that the transmission lines in Dezhou and Shandong Province will be upgraded and renovated in the near future to improve their load capacity.

However, Huang Ming has his own plans. The ownership of Himin Group's Solar Valley Industrial Park is expected to be fully clarified and transferred around August this year.

Himin Group, whose core business is the solar energy industry, aims to take over a portion of Dragon Totem's solar panel business in the near future, while also deepening its involvement in the downstream of the solar energy industry.

The Solar Valley Industrial Park is a very good starting point. For example, the concept of green living based entirely on solar energy, ecotourism, and three-dimensional agriculture are all good development ideas.

Huang Ming plans to gradually expand the scale of Solar Valley and include a nearby reservoir within the industrial park. By laying solar panels on the reservoir, he can make use of the reservoir's water area and reduce water evaporation.

After the meeting on the power supply in Dezhou, Wang Shuo went directly to the Dezhou Power Plant, where the three North Wind-2 were being installed and tested.

Accompanying him was Zhao Xiaojun, the manager of Blue Era's Shandong Province branch.

"It seems that the technology at the North Wind Factory has improved considerably."

Wang Shuo nodded. "The thermal efficiency of the cycle combustion is around 55.7%, and with the addition of the thermoelectric power generation module, the overall thermal efficiency has reached 66%."

The person in charge of the power grid, who was standing to the side, remained silent.

Zhao Xiaojun turned around and said, "President Zhang, you can consider our company's proposal."

"Mr. Zhao, is it inappropriate to build a separate line?" Zhang Xingzhou's words revealed deep concern.

"Mr. Zhang, you've seen the electricity consumption of the East Water Transfer Project. The water pipeline from Dongying to southern Hebei Province has already been laid, and there are other lines as well. The power consumption for pressurization and water distribution stations is considerable, so running a separate power line is a last resort."

Faced with Zhao Xiaojun's request, Zhang Xingzhou couldn't agree immediately, "I will report this to the head office."

Zhao Xiaojun had actually anticipated the power grid's attitude. State-owned enterprises sometimes prioritize avoiding mistakes over achieving success.

Blue Era also has a second option: to expand its own power supply capacity. Although the power generation group cannot directly sell electricity to Blue Era, the company's self-sufficiency in power supply is a legal practice.

Using electricity from the power grid is often a reluctant choice. Due to the need for peak shaving and valley filling, industrial and agricultural electricity use has to be sacrificed while ensuring residential electricity supply.

This is why the Suiren Group vigorously developed a self-sufficient power generation system from the very beginning, with the aim of reducing dependence on the power grid and also to reduce costs.

The Suiren Group, capable of producing its own natural gas, possesses many inherent advantages in its self-sustaining power generation strategy.

However, due to the rapid development of the Suiren Group, many branch offices were unable to set up their own generator sets in time and had to temporarily rely on the power grid for electricity.

However, given the East Water Transfer Project, which delivers tens of billions of cubic meters of water annually, the problems that could arise if the power grid doesn't provide a dedicated line for Blue Era could be very serious.

Electricity is one of the necessities of Hyundai life, but water is an age-old necessity.

The number of water transmission lines in operation and under construction will continue to increase, which will severely test the power grid's supply capacity.

It's better to rely on yourself than on others. After inspecting the Dezhou Power Plant, Zhao Xiaojun wrote an email to President Li Feiyang, explaining the power supply pressure on the northern water transmission system and hoping that the head office would resolve the issue as soon as possible.

After writing the feedback email, Zhao Xiaojun received an invitation from Xiao Yuan, president of Prosperous People Agriculture, to travel together to Anyang City in Henan Province.

Because the western end of the Dongying Line has already been laid to the vicinity of Anyang City.

Prosperous People Agriculture, which is developing rapidly on the North China Plain, is also expanding at an accelerated pace as water pipelines extend.

The recent development of Prosperous People Agriculture in Anyang is in this state. After receiving the invitation, Zhao Xiaojun checked his schedule, adjusted a few arrangements, and accepted Xiao Yuan's invitation.

The staff of both companies quickly made preparations for their trip to Anyang.

Thank you everyone for your support (ω`).

End of Chapter
PrevPreviousNext
NovelSummaries

Explore the wiki

Suiren Group

Comments

No comments yet.
AboutStatsAPIChangelogStatusContactPrivacyTermsDMCA
© 2026 RandomTranslator·v3.27·RSS