Zitong County, Stone Ox Town.
After spending two days inspecting Rongcheng, Huang Xiuyuan arrived here.
Not far from the ancient Golden Ox Road in Stone Ox Town, hidden among the towering mountains, lies a research institute of the Suiren Group, called the Tunnel Excavation Research Institute.
The research institute is located halfway up a mountain and uses silicate-sodium chloride material, the same material used to build superhighways, combined with silicon nano-coatings and iron-silicon nanowires.
This new type of building material is ideal for use in areas like Shu Province, which are prone to landslides and earthquakes. With the addition of solar panels on the roof, as well as stored fresh water and food, it is more than adequately equipped even as a doomsday base.
Standing on the research institute's observation deck, gazing at the lush greenery in the distance, where the Ancient Golden Ox Road was hidden, Huang Xiuyuan exclaimed in admiration:
"The road to Shu is harder than ascending to heaven! Cancong and Yufu, how vague their founding of the state! Forty-eight thousand years have passed since then, and it has not been connected to the Qin region by human habitation. To the west, there is a bird path near Mount Taibai, which can traverse the summit of Mount Emei. The earth collapsed and the mountains crumbled, and brave men died, and then the heavenly ladder and stone plank roads were linked together."
"This Ancient Golden Ox Road is the mountain that the King of Shu sent five men to open up. Legend has it that the five men were buried by a landslide in Zitong," Yang Shuli, chief researcher at the Tunnel Excavation Research Institute, said with a smile.
Huang Xiuyuan knew the legend of the Five Ding opening the mountain. In future archaeological discoveries, a pre-Qin era site was found near the Wuding Mountain in Zitong County. According to archaeological findings, it was determined to be the caravan of the Five Ding escorting five women from the Qin state.
Various signs at the archaeological site indicate that when the wedding procession reached Zitong County along the Ancient Golden Ox Road, it encountered a landslide, burying the entire procession near Wuding Mountain in Zitong.
Later, the Qin state used the Ancient Golden Ox Road to enter Shu and destroyed the Kaiming Dynasty. With the help of misinformation, it gradually became known as the story of the Five Ding Opening the Mountain and a series of legends.
Putting away these distant memories, Huang Xiuyuan and Yang Shuli walked into the research institute. The integrated building constructed with new materials added a touch of science fiction to the entire institute.
Two weeks ago, he approved a 2 billion yuan upgrade and renovation plan for Hope Primary Schools in Southwest China. The plan first focuses on upgrading and renovating Hope Primary Schools in mountainous areas located in earthquake zones, transforming them all into integrated buildings.
The authorities also plan to gradually promote infrastructure and high-rise buildings in the Southwest China, requiring the use of new materials in construction to ensure overall seismic performance, which can be improved to withstand earthquakes of magnitude 8 to 9.
The two entered the mountain-mounted building of the research institute, which contained a huge tunnel. This was the experimental site of the Tunnel Excavation Research Institute.
Yang Shuli led him to the protective gear changing area, where he changed into protective clothing and a helmet, and then they arrived at the tunnel excavation experimental area.
The area where they were standing was surrounded by high-strength panels, which was sufficient to ensure the safety of the interior.
A dozen researchers, dressed in protective suits and helmets, were operating various equipment as they worked in the rock formations ahead.
"Chairman, this is the new excavation plan for the Wuding Plan," Yang Shuli said, pointing to the equipment in front of him.
Huang Xiuyuan picked up the custom tablet that Yang Shuli handed him. It contained various information about the "Wuding Plan." In addition to the Suiren Group, the project also involved the Chinese Academy of Engineering, the Chinese Academy of Sciences, and several universities.
Traditional tunnel excavation construction methods include either excavating the entire tunnel and then backfilling it (mostly used for early shallow subways), blasting, and, in recent years, tunnel boring machines (TBMs).
Regardless of the approach chosen, the difficulty and cost of construction increase exponentially when encountering dense rock formations, especially in regions with complex terrain like China. In road construction in the Southwest China and southeast, the probability of tunnel excavation is almost 100%.
While tunnel boring machines are good, their excavation speed is not fast, and their excavation costs are quite high.
To accelerate and facilitate the implementation of the Western Development Strategy, the Suiren Group and the Chinese Academy of Engineering took the lead in establishing this research institute.
After reviewing the detailed information on the tablet, Huang Xiuyuan looked up and glanced at the construction site not far away.
Several streams of steaming, pale red water flowed down from above the rock strata and onto their surface.
The researcher pressed the power switch, and the current passed through the pale red liquid, producing a chemical reaction on the surface of the rock wall. The Hexa-conical Spherical Oxygen in the liquid began to plunder silicon atoms in the rock layer and release a large amount of oxygen.
The ventilation system removes the dense oxygen from the work area and simultaneously pumps the light red water from the ground pool back into the circulation system.
After the power was on for twenty minutes, the researcher Shimonoseki switch.
The excavator extended its bucket and scraped across the rock strata, causing large sections of rock to collapse, resembling severely weathered limestone.
After scraping for a while, Huang Xiuyuan estimated that they had dug to a depth of half a meter.
"At this depth, the decomposition fluid shouldn't be able to penetrate, right?"
Yang Shuli explained with a smile, "We use a drilling aid, drilling densely packed small holes 0.6 meters deep each time, inserting absorbent sponges, and then pouring on a decomposing liquid. This decomposing liquid will then seep into the rock mass through the sponges. Combined with the cracks in the rock strata themselves, it can break down the rock strata to a depth of 0.5 to 0.7 meters after electricity is applied."
While the two were talking, the excavator had already scraped off the corroded parts of the rock strata, exposing the uncorroded rock layers and some shallow holes.
The excavator scooped the soil onto a sand and gravel conveyor belt and transported it out of the work area.
Another machine, equipped with a high-density drilling machine, began working on the rock strata. With the high-hardness drill bit running at full power, it drilled rows of dense small holes in half an hour.
Then, an absorbent sponge is mechanically inserted, a decomposing liquid is poured in, and electricity is applied to decompose the rock strata.
One cycle takes about two hours.
"The efficiency is still a bit slow; we only managed to dig a little over two meters deep in one shift." Huang Xiuyuan was clearly dissatisfied with the speed.
Tunnel boring machines can advance 6 to 10 meters per day in hard rock formations. Even if new excavation technologies operate 24 hours a day, they can only achieve a progress of 6 to 7 meters, which is insufficient to form an overwhelming advantage.
"Chairman, this current operating method is actually just for experimental use. We will conduct joint operation tests with the tunnel boring machine next." After Yang Shuli finished speaking, he found another experimental plan on the tablet computer.
Huang Xiuyuan took it and looked at it.
The decomposition method combined with the joint operation of tunnel boring machines can indeed effectively improve the operation speed in supercomputing simulations.
However, in reality, it's not that simple. The reason is that the Hexa-conical Spherical Oxygen in the decomposition solution has extremely strong electrolytic properties. Once electricity is applied, it will aggressively plunder the surrounding atoms and also produce a large amount of high-purity oxygen.
Therefore, if the decomposition method is to be combined with the tunnel boring machine (TBM), it is necessary to ensure that the TBM is not decomposed by the decomposition fluid. This places very high demands on the control of the temperature and current intensity of the decomposition fluid.
The current solution is to replace some of the materials used in the tunnel boring machine with elements that are less susceptible to being stripped away by the decomposition fluid, ideally materials that have significantly different temperature and current requirements from silicon atoms.
As for the issue of high-purity oxygen, it's not difficult to solve.
Once these problems are solved, combining the decomposition method with a tunnel boring machine to advance 30 meters per day is not difficult.
Even granite-level hard rock becomes indistinguishable from ordinary loess layers under the corrosive effects of decomposition.
Huang Xiuyuan instructed, "You should discuss with China Railway as soon as possible and get a tunnel boring machine over for testing."
"Don't worry, Chairman. China Railway is even more anxious than we are. The tunnel boring machine is already on its way."
Thank you all for your support (ω`), and thank you to book friends "Qingtianyi", "Dudu Chen and Mr. Zhao a next door, Dad Gu", "Book Friends 20190524103556045", "Uh-huh", "Book Friends 201" 91018204305969", "Tang Dao Dao Dao Dao", "Book Friends 20210303141112123", "Moon Cold Heart", "Book Valley Bug", "Disdain the Boss Disdain" rewards!