Nam Co Nuclear Power Plant.
Passing through deserted passageways, one encounters buildings constructed from super-materials; if these are residential or commercial buildings, they may have undergone secondary interior renovations.
However, industrial buildings, especially those with underground foundations, are generally kept in their original state.
The walls were silver-gray, the ceiling was also pure white, and the air conditioner vents were blowing air at 26 degrees Celsius.
Huang Weichang was extremely familiar with this architectural style, and he minimized the interior decoration, which is a consistent style of industrial architecture.
Ai Yanmin, the manager of the nuclear power plant, was a rigid and serious man. He led Huang Weichang and his group to the main control room of the nuclear power plant.
The Nam Co Nuclear Power Plant has been in trial operation for more than two months and is currently operating very well. The plant has a total of three Tanggu 1.5 nuclear fusion systems.
"... General Manager Huang, Unit 1 and Unit 2 are currently operating normally, and Unit 3 is undergoing final installation." Ai Yanmin explained, pointing to the nuclear power plant floor plan in the control room.
Huang Weichang glanced at it.
On the nuclear power plant's plan, the three nuclear fusion generator units are not clustered together, but rather spaced 1.3 kilometers apart, arranged in a linear array along the mountainside.
Units 1 and 2 are the main operating units, while Unit 3 is the peak-shaving and backup unit. The power output of a single nuclear fusion generator unit is 8,000 megawatts.
After reviewing some materials, Huang Weichang looked up and asked, "I heard that the improved unit is much smaller?"
Ai Yanmin nodded. "Yes, compared to the first-generation unit, the size has been reduced by about 24 to 27%, and the power and efficiency have been significantly improved."
After assessing the power requirements, Huang Weichang also considered the electricity needs of indoor agriculture in the Snowland Region.
The total power of the three nuclear fusion generator units is 24,000 megawatts. Considering peak shaving and backup, the average power should be around 20,000 megawatts.
The annual power generation can reach 175 billion kilowatt-hours, which is equivalent to only 1.7 Three Gorges Hydropower Station.
The advantage of nuclear fusion power plants lies in the fact that, through continuous technological improvements, they have adopted an internal circulating water system, allowing the fresh water that is added to the steam turbine at one time to be recycled for a long time.
The average monthly hydration rate is approximately 2.1% to 3.4%.
Huang Weichang then asked, "Old Ai, how is the cooling water at the power plant handled?"
"Currently, it's mainly used for heating within the base and nearby villages and towns; the remainder will be temporarily released into Lake Namtso," Ai Yanmin added.
"About 5 kilometers from the base are the Lake Namtso indoor agricultural factory, freshwater plant, and salt factory, and then the Lake Namtso town. The agricultural factory is not yet in operation, but once it is, the cooling water supply will be insufficient."
Nuclear power plants produce cooling water, which is unavoidable.
According to thermodynamics and the law of conservation of energy, even with high thermal efficiency, a nuclear power plant cannot achieve 100% thermoelectric conversion.
Even with thermoelectric power generation systems, the overall thermal efficiency of controlled nuclear fusion is still at its limit of 75.1%, and it is very difficult to further improve the thermal efficiency at this stage.
Therefore, during the power generation process, some energy is discharged as waste heat, with cooling water accounting for the majority of this waste heat.
This cooling water can be recycled as secondary waste heat using a thermoelectric generator module and a supplementary heating furnace.
However, the engineers chose to abandon this design because the economic benefits generated by this waste heat secondary power generation system would take decades to recover the equipment costs, and the efficiency improvement would only be 1-2% at most, making the cost-effectiveness too low.
Since the waste heat has already been used for power generation once, the heat from this cooling water is difficult to directly utilize for power generation again using the temperature difference. It is necessary to supplement the heat and increase the temperature to meet the temperature standards for secondary power generation.
However, heat replenishment must be added from an external system, which leads to system bloat.
As for circulating cooling water into the steam turbine, this practice is counterproductive because high-temperature saturated steam is not allowed to enter the steam turbine. This not only fails to improve efficiency but also reduces it, and may even cause fluctuations in power generation.
Instead of going through the trouble of generating electricity from waste heat, it would be better to directly transport the cooling water to provide heating for the surrounding area.
Huang Weichang knew why the Suiren Group chose to locate its nuclear power plant here.
Lake Namtso is a high-altitude saltwater lake and the second largest saltwater lake in the region. There are freshwater purification plants, lake salt plants, and a large lakeside plain. It is surrounded by high mountains and is a sparsely populated area.
Although Lake Namtso appears to be sparsely populated, Nyenchen Tanglha Mountains Lake Namtso Tunnel has been completed, and it is only about 40 kilometers away from Damxung City, a hub city on the Qinghai-Tibet Railway.
With a branch line of the superhighway, transportation between the two places is very convenient, taking about half an hour by car.
The electricity generated by the nuclear power plant cannot be consumed by Lake Namtso alone. In addition, it will also provide fresh water, salt, chemical raw materials, construction salt (a filler for super materials), and agricultural factories that will be built in the future, which will export large quantities of grains, vegetables and fruits.
According to the plan, the Snowland Region and Qinghai will build six controllable nuclear fusion power plants between 2016 and 2021, increasing the annual power generation of local nuclear power plants to 1.2 trillion kilowatt-hours.
If calculated based on the population of both locations, the per capita power generation here would reach an astonishing level.
The combined population of the two areas is less than 9 million. By around 2021, the total annual power generation will reach 1.3 trillion kilowatt-hours (including other hydropower, solar energy and geothermal energy), with an average of 144,400 kilowatt-hours per person.
If this number were released, it would be absolutely terrifying.
As for whether such a frenzied construction of nuclear power plants will lead to climate change on Blue Star, the Chinese Academy of Sciences, the Chinese Academy of Engineering, and the Suiren Group Scientific Research Department have conducted a climate simulation.
The emergence of controlled nuclear fusion power plants will not have a significant impact on the climate of Blue Star for the time being, and may even alleviate global cooling to some extent.
Many people worry that nuclear fusion power plants will lead to global warming, but this is not something that will be apparent in the short term.
After all, since the first nuclear bomb was detonated by mankind, thousands of nuclear tests have been conducted around the world, especially the Tsar Bomba by the Russians, which had a yield of more than 50 million tons, but the energy released by a small earthquake is still less.
In fact, the heat in the Blue Star's ecosystem mainly comes from the stellar radiation energy of the Sun and the geothermal energy from nuclear decay in the mantle and core.
The heat generated by humans detonating a nuclear bomb or a nuclear power plant is not yet comparable to that of either.
At least in Huang Weichang's understanding, unless human civilization works together to set mountains on fire and power plants operate at full capacity, it will be difficult to reverse the major trend of global cooling.
Unfortunately, everyone is now minding their own business, and in the economically sluggish West Continent North America, factory operating rates are less than 46%.
Despite being the world's factory, Greater China is reducing its carbon emissions due to technological innovation.
Tianzhu, which was originally a potential world factory, has also fallen apart due to internal and external difficulties.
As for other regions, it's not that Huang Weichang looks down on them, but rather that they are truly not qualified to participate in such world-class issues.
Of course, if the oil giants of West Asia could make the tough decision to continuously extract and burn the oil and natural gas from their Tanaka, it might slow down the rate of global cooling.
But West Asia's only strategic resource is oil and natural gas. Letting them burn their own oil and gas resources to warm the whole world is less desirable than taking a few more breaths of cold air.
Thank you everyone for your support! (ω`)