Skip to main content
  • Home
  • Library
  • Read
    • Popular
    • Charts
    • Browse
    • Categories
    • Wikis
    • Glossary
  • Request
  • Activity
  • Leaderboard
  • Help
Our Apps
  • DaoSearch
  • Narratorr
Social
  • Discord
  • Patreon
Wasteland Border Inspector
Chapter 279

Operation Begins, Repair the White Water Dam!

3,995 words 13 min read 1 view 4mo ago Source ​
Skip to the end of the chapter
Prev
Next

Consistent with the findings two months ago, the damage to the White Water Dam has not worsened and remains stable.

Cheng Ye walked around and observed the area, quickly finalizing the overall construction plan in his mind.

First, the water flow must be diverted to ensure the dam body remains dry during construction. This is not a problem at all in Wasteland. In the vast wilderness, the water can be diverted in any direction, even if it flows to nearby abandoned villages.

After the diversion is completed, the carbonized surface of the dam body is cleaned, and C30 concrete is mixed in proportion and poured in layers. It can be put into use after one week of curing.

As for dam reinforcement, it is only necessary to drill holes in the base surface, insert steel anchor bolts, and then weld the steel bars to the anchor bolts to form a reinforcement mesh. It can support the dam for several years without any problem. It is not too late to dismantle and rebuild the dam when funds and time are available in the future.

Overall, repairing the dam body is the most time-consuming part. The remaining tasks, such as updating the spillway gates and replacing the power equipment, are technically demanding and can be completed in half a day.

Cheng Ye casually lifted the tarpaulin, checked the material labels, and found that after going through Davidson's channels, the Industrial Zone not only provided the materials as required, but also gave him an extra 15% margin, which put his mind at ease.

The only problem was manpower; the original plan was to hire 2 structural engineers and 15 skilled workers, with a construction period of 15 days.

But now all the Satellite City are scrambling for construction resources. Big Wave Town started too late, and the engineers from the Public Works Department have already been snapped up. By the time they have time, it will be at least one or two months, and winter will be almost here.

Therefore, after much thought, Cheng Ye simply decided to do it himself.

Now open the panel and click on the action function that hasn't been used for a long time; you only have 60 Action Points left.

Unfortunately, Charge Value were scarce in the early stages, and exchanging Charge Value Action Points was too wasteful. Of those 60 points, 41 were earned over three days by taking advantage of the special mechanism of abandoning searches to get double Action Points back, which was equivalent to exchanging them directly with Charge Value.

"Once the Hydroelectric Station is built, the rate of strength improvement will slow down, making it much easier to farm Action Points."

Cheng Ye secretly made his own plans.

This feature was originally intended to help Collector quickly build their power and save time, but after he obtained the Collector, he either had no chance to leave the city or had to deal with the Immortal Relic, and only now has he truly been able to free up his hands to do anything.

"Action: Repair the Hydroelectric Station, restore the water."

He silently repeated the command three times in his mind, and a blue panel suddenly unfolded beside the White Water Dam, clearly listing the Action Points required for repair, the breakdown of steps, and the estimated completion time.

[White Water Dam (Lv0; Damaged)]

[Description]: This gravity dam, inherited from Old Era, is currently severely damaged internally. The dam surface is carbonized and peeling, with numerous weathering cracks. Although the core load-bearing structure has not collapsed, its stability is insufficient, rendering it unable to properly intercept water flow or perform production operations. Systematic restoration is urgently needed.

[Direction of Action]:

1. Water diversion (excavating a new river channel, using sandbag barriers and diversion channels to guide the current waterway, clearing the dam work area, and creating a dry and stable restoration environment)

Estimated Action Points required: 33 (Sufficient materials and tools have been obtained, so action points required are decreasing).

2. Base repair (after cleaning the surface slag and carbonized debris of the dam body, fill shallow weathering cracks and spalling areas, reinforce the steel bars, and repair the sealing of the dam foundation)

Estimated Action Points required: 81 (Sufficient materials and tools have been obtained, and the pre-processing skill has been approved, so the point consumption has decreased).

3. Functional equipment upgrade (replacing aging and obsolete core components of the power unit inside the dam)

Estimated Action Points required: Lock On (Current conditions do not meet the action criteria; please try acquiring construction machinery).

4. Perfect upgrade (structural modification to improve the Hydroelectric Station's production efficiency, increasing its installed capacity to 750kW and its theoretical maximum power to 1200kW)

Estimated Action Points Required: Lock On (Current skills do not meet the action requirements. Please try to acquire advanced construction skills or construction machinery.)

[Collector, please select your action direction!]

"Hiss, the points cost for water diversion and base repair are so high? It's almost a hundred points in total?!"

As Cheng Ye glanced at the numbers on the panel, he couldn't help but gasp.

These kinds of purely physical labor-intensive projects should theoretically have low technical barriers, so the demand for Action Points shouldn't be so exaggerated.

But on second thought, this was a workload that would normally take 15 workers half a month to complete, but now he alone could finish it in a very short time, so it was reasonable for him to have such a demand for points.

As for the fourth point, "perfect upgrade," Cheng Ye only glanced at it before skipping over it for the time being.

The current theoretical installed capacity of White Water Dam is 300kW. The industry's conventional loss rate is between 5% and 10%, which translates to an output of about 270-285 kWh of electricity per hour and a daily power generation of 6,500 kWh.

This amount of electricity is enough for him to fully charge the Collector eight times. Even if a portion is used to supply Big Wave Town, the town doesn't have any factories in the early stages, so the electricity demand is not large and can fully meet his needs for freely using the Collector.

Once the town develops and the demand for electricity increases, upgrading the Hydroelectric Station will be easier to implement.

"Yes, in addition to the existing equipment, we also need to add Energy Storage Device and transformer equipment."

Cheng Ye pondered to himself. The town's electricity demand is intermittent. Without a complete power grid, it must rely on Energy Storage Device to "store electricity" in order to ensure a stable 24-hour power supply.

By peak shaving and valley filling, the excess power generated by Hydroelectric Station can be stored and released during peak electricity demand or when power generation is insufficient, thus avoiding power outages.

However, these devices are all controlled materials in Xingfu City, and a reasonable explanation is required to apply for them.

Only after the Hydroelectric Station is repaired and passes on-site inspection by personnel from the Industrial Zone will the relevant supporting materials be delivered according to the established procedures.

Based on current power generation capacity estimates, at least 1,000 kilowatt-hours of batteries are needed to fully store surplus daily electricity and prevent waste.

Currently, the official battery purchase price in Xingfu City is 15,000 Contribution Points per Baidu. Based on this calculation, purchasing batteries alone would require spending 150,000 Contribution Points.

Even with the support Big Wave Town has received from various parties, this is still an astronomical figure that is staggeringly large.

"We have to negotiate support policies. The reason batteries are so expensive is simply to prevent the outflow of core resources. I'm using these batteries for the construction of Big Wave Town, which is meant to expand the influence of Xingfu City. Charging such a high price is really unreasonable!"

Having made up his mind, Cheng Ye stopped worrying about the battery and turned his attention back to the Hydroelectric Station.

He decided to use Action Points to complete the most troublesome part of all the projects: cutting off and diverting water.

The subsequent mortar application and steel reinforcement can be handled by sending residents from Big Wave Town. As for equipment installation, he plans to ask Lin Bao for a few engineers and construction machinery.

Inspector Cheng isn't a donkey pulling a millstone; he can't exactly transform into Ground-Shrinking Giant Louse, nimble louse, huffing and puffing as he carries the equipment upstairs.

Furthermore, the subsequent debugging work also needs to be done by professionals, and he studied civil engineering, not electrical facilities.

"Action! Cut off the water supply and divert the flow!"

Cheng Ye silently recited the command, and the moment his thought landed, his long-dormant action functions activated.

The next second, a miraculous scene suddenly unfolded!

The rushing water suddenly stopped in the middle of the river, the splashing droplets solidified into glistening particles suspended in mid-air, and the wind in the distant wilderness seemed to have been paused.

The Time Stop space unfolds once more.

The moment Cheng Ye lost control of his body, his perspective suddenly rose, as if lifted up by Tan Ming's power, transforming into a third-person perspective overlooking the earth, with the entire view of the White Water Dam and the entire river channel in full view.

In his field of vision, a figure of similar stature appeared as if it had been put on fast-forward, its speed increasing by more than a hundred times. It grabbed a heavy hydraulic pick that had been prepared in advance and rushed to the pre-set position upstream of the river, a hundred meters away from the dam.

The roar of the hydraulic pick was filtered by the Time Stop space, leaving only the afterimage of its swift movements. First, it quickly chiseled along the marked arc, peeling away layer by layer the hard surface of the concrete riverbed under the pick, while the flying gravel and mud remained suspended in mid-air.

Immediately afterwards, he switched to using an entrenching tool to widen and deepen the trench he had dug. He then dragged out a roll of thickened canvas and dozens of folded sandbags from the pile of supplies, filling and stacking them with astonishing efficiency. He built temporary barriers on both sides of the trench, forming a sloping guide slope.

"Holy crap, I'm actually this efficient at this job?"

Even though he had witnessed the efficiency of the action function before, Cheng Ye was still taken aback.

Within the Time Stop space, he could maintain peak physical fitness, never letting up, and every swing of his tools seemed precisely calculated, using not a ounce of extra force, each strike just right.

In the blink of an eye, a half-meter-wide gap had been carved out of the concrete river channel that originally led straight to the White Water Dam. The figure then carried a prefabricated alloy diversion channel, precisely embedded it into the inside of the gap, fixed it to the bottom of the river channel with Expansion Bolt, and then laid the canvas into the channel, compacting the edges with gravel.

This is to reduce water erosion and prevent the diversion channel from collapsing.

As the last sandbag was firmly placed, the Time Stop effect was lifted, and the previously still water seemed to break free from its restraints, pouring out along the guide channel and rushing towards the low-lying area pre-designed in the wilderness.

The gap, under the initial impact of the water flow, quickly widened to more than one meter, ensuring that the water flow in the main channel could be smoothly diverted and that no residual water would affect the dam operation.

[Operation complete!]

The perspective was instantly pulled back.

The whole process was so fast it was dazzling; it seemed like only a second or two had passed before the original riverbed was completely transformed.

Cheng Ye was stunned for a moment. Compared to Search Skill, items, or information, this ability to actually modify the environment shocked him even more, and he was unable to calm down for a long time.

Powerful!

That's incredibly powerful!

What would normally require a large number of workers and machinery, he accomplished easily by himself, shortening the Hydroelectric Station's repair time by about five days with just this one step.

He walked to the opening, bent down, and confirmed that the water was flowing smoothly out of the opening. He knew that it would take at most half a day to create dry conditions for construction, and he became extremely excited.

With such efficiency and speed in terms of mobility, he could build a massive base all by himself, provided he had enough energy.

This ability is far more monstrous than the two beliefs Tan Ming bestowed upon me, and it comes at absolutely no cost!

"The renovation of underground caves—as long as the technology and materials are in place, and with the energy support of Hydroelectric Station —I can complete it all by myself!"

Cheng Ye stood quietly for a moment, and after confirming that there were no problems with the diversion, he turned around and drove back to the town.

Taking care of three thousand people is a troublesome task, but fortunately he has many capable people at his disposal to share the burden.

At this moment, Big Wave Town is like a place ravaged by locusts. The originally decaying ruins are being gradually "eaten away" and turned into neatly stacked piles of construction waste.

As the old, dilapidated buildings that once littered the town disappeared, the town's advantageous terrain became fully apparent.

Not only is the transportation convenient, but the surrounding area has also become extremely flat due to years of flooding and erosion by the river.

With an endless plain on one side and the winding Whitewater River and Yellow Water River on the other, Big Wave Town is situated between the two, enjoying the best of both worlds, making it difficult for it not to develop.

At 4 p. m., Cheng Ye returned to the river to check the diversion situation and found that there was only a shallow layer of water left on the riverbed. The upper part of the Hydroelectric Station had been completely exposed. He immediately rushed back to the town to organize manpower.

Not too many are needed; fifty people will suffice.

The Engineering Team that Huang Sheng brought was perfectly capable of handling tasks such as mixing mortar and pretreatment materials.

The only problem is that the road from the town to the Hydroelectric Station has not yet been cleared, and the surrounding area is overgrown with weeds and tall trees, which must be cleared as soon as possible.

Wu Rui was assigned to lead a small team to guard the area around the Hydroelectric Station, Cheng Ye donned the Fire Lotus Battle Armor and once again threw himself into the work of clearing the surrounding wilderness.

Time passes unnoticed in the mountains; the passing of winter's chill leaves no trace of the year.

Even when staying in the Buffer Zone, there is still a distinction between day and night, and a daily rhythm defined by work hours.

But once you arrive in the vast wilderness, time gradually blurs its boundaries in the repetitive labor, becoming blurred and ephemeral.

As dawn breaks and the first hint of light appears in the east, Cheng Ye is often the first to get up, donning his gear and leading his team to continuously explore new frontiers.

As darkness fell and the last rays of the sunset faded, Cheng Ye was once again the last to return to rest. Even during his brief mealtime, his brow was furrowed as he drank his Nutrient Paste while listening to the team members' reports, constantly reminding them of precautions and considering every detail thoroughly.

On this long road to rebuilding civilization, time has long lost its meaning of being counted in days.

The days are stretched out, measured in weeks, months, and even years, to measure the transformation of every inch of the land.

The initial excitement and fervor in everyone's hearts, like a Wildfire, gradually diminished in the face of the heavy labor and monotonous repetition day after day.

But this feeling never truly disappeared. Instead, it settled and transformed into a calmer and more resilient force through the construction of Big Wave Town and the mutual support among its people.

Hope!

It resides in the depths of everyone's heart, hides in every new seedling that sprouts from the soil, and shines in the unextinguished light in everyone's eyes.

In the blink of an eye, three days have passed!

September 11th.

Before the sky was fully bright, the Defense Communicator vibrated slightly, Cheng Ye immediately opened his eyes.

Sure enough, I felt an uncontrollable soreness all over my body. Even though my physical condition had already become superhuman, the amount of labor I had done over the past three days had also increased dramatically.

What used to take three to five days to complete, he can now finish in a day, making his physical strength seem increasingly "insufficient".

"Oh, today is the day we're going to pick up Yu Yong."

The calendar reminder on the Defense Communicator screen caught Cheng Ye's eye, and he paused, slowly getting up.

He reached out and unzipped the single tent; autumn dew dripped down the edge of the tent, bringing a slight chill to his collar.

When I crawled out of the tent, it was just getting light.

The pale gray sky was slowly being bathed in the Morning Light of dawn, the air filled with the fresh scent of grass and trees and the dampness of the earth, the lingering stench of decay from the ruins of the past was gone.

Compared to three days ago, Big Wave Town now appears unusually empty, somewhat resembling the southern suburbs of Buffer Zone.

But this is not a desolate emptiness; rather, it is a vast expanse that has been carefully cultivated.

The ruins have long since vanished, leaving only the leveled land stretching into the distance.

Behind his tent, nearly a thousand tents of various sizes and colors were neatly arranged, resembling a temporary campsite in the southern suburbs.

In the initial stages of land reclamation, life was indeed kept simple.

Fortunately, the cleanup of the ruins is nearing completion. The broken walls and rubble that once stood in the town have all been transported to the outskirts and piled up.

Standing in the center of the town, Cheng Ye looked towards the river with an unobstructed view, able to see the rushing Whitewater River at a glance.

According to the plan, after another two to three days of thorough cleaning of the roadbed, the pipeline renovation can begin, and Various Pipes will be buried deep underground.

Taking a deep breath of fresh air, Cheng Ye turned around and climbed onto the rooftop of the only remaining government building in the town center, looking around.

Three days of continuous land reclamation have cleared a full kilometer of wasteland, creating a wide open space amidst the surrounding wilderness and providing ample buffer zone for Big Wave Town.

According to the plan, the area will be expanded outwards by another two kilometers before reclamation stops and the first line of defense is built.

However, time is limited at the moment, so Cheng Ye is focusing his attention on the road leading to the Hydroelectric Station.

Looking out now, the dirt road leading from the west side of the town to the Hydroelectric Station has been cleared of weeds and trees, leaving only a straight and flat dirt road stretching into the distance.

With unpolluted air, visibility was extremely high; standing on the rooftop, one could even see the outline of Hydroelectric Station two kilometers away.

"What a vibrant and lush life!"

Cheng Ye stretched comfortably, sat on the edge of the rooftop, and let the warm Morning Light shine on him.

He could clearly sense that the once dilapidated Big Wave Town was gradually rising from the ruins, steadily moving towards becoming a decent home.

This is something that other Satellite City do not possess.

The construction of those Satellite City was ultimately just building fortresses to accommodate residents, while only his Big Wave Town was steadily progressing according to the standards of Sanctuary City.

Only when the sun had completely risen above the horizon, and golden sunlight bathed the earth, and the residents gradually emerged from their tents, did Cheng Ye get up and walk back to the flat ground.

As is customary, he first went to check on the progress of the dam's repairs.

Three days later, the basic repair work was nearing completion. Cheng Ye silently activated the action function, and the Action Points required for the basic repair displayed on the panel had decreased from the initial 81 points to 12 points.

It would only take another day to complete, but he had to go back to the Buffer Zone to pick up Yu Yong today. He didn't have time to wait for the residents to slowly apply mortar and build reinforcement nets, so he simply used up 12 Action Points to end this phase of the project.

As the figures in the Time Stop space precisely filled and laid the prepared materials on the ground, all that's left is to wait for the materials to dry naturally before proceeding to the equipment installation stage. The Hydroelectric Station is getting closer and closer to being put into use.

"Xiao Kang, I need to go back to the Buffer Zone." Cheng Ye opened his Defense Communicator, first calling the community to confirm the situation, then found Wang Kang and said, "Uncle Lin and Luo Kuke are out too. I'll bring them over on my way to help you relieve some of the pressure."

Wang Kang was clearly exhausted and somewhat dazed. Upon hearing this, he simply nodded blankly, then quickly returned to his absent-minded state.

Cheng Ye shook his head helplessly. Although he could understand his exhaustion, there was nothing he could do.

During these three days, the residents could take turns resting while the residents worked more than sixteen hours a day. However, he and Wang Kang, the two "backbones," had no chance to rest.

When leading a team to explore new lands, one must always be on guard against Infection Source emerging from the remote corners of the wilderness.

One of them stayed in the town to oversee the construction, running around from beginning to end, coordinating progress and solving problems; he was already working beyond his capacity.

Fortunately, Luo Kuke's arrival should help with the rotation, giving Wang Kang a break.

After loading and securing the more than twenty Containment Box into the back of the armed pickup truck, Wu Rui's team stayed behind to guard the town and ensure no accidents occurred, as instructed by him.

Mu Shuang followed, got into the driver's seat of the pickup truck, and sped off towards the Buffer Zone.

In just three days, the rural road leading to Wayfinder County has been paved with a brand-new four-lane asphalt surface.

Driving on it felt like riding a magic carpet; you could barely feel any undulations.

Cheng Ye yawned, tilted his head, and closed his eyes sleepily again.

As the vehicle gradually came to a stop, he opened his eyes, and the three busy days seemed like a dream, and he was back in front of the South Checkpoint.

End of Chapter
Prev
NovelSummaries
Next

Explore the wiki

Cheng Ye
Xingfu City
Big Wave Town
Luo Kuke

Comments

No comments yet.
AboutStatsAPIChangelogStatusContactPrivacyTermsDMCA
© 2026 RandomTranslator·v3.26·RSS